Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T07CM04843
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/05/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
02/13/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T07CM04843 2/13/08 1. Specify a 400A fuse for the Chillers per the Schedule on Sheet M1. It is not clear from the annotation on the line diagram that a fuse is called out. Could be just the device rating. 2. Specify how power is being provided for IRC-1 through IRC-13. SECOND REQUEST. 3. Please add a note which requires that the generator be listed by an Independent Testing Laboratory. THIS COMMENT WAS MADE ON THE FIRST SUBMITTAL. ANNOTATED NOTE CALLS FOR THE TESTING OF THIS GENERATOR, NOT ITS LISTING. IF THE INDIVIDUAL UNIT IS TO BE FIELD-TESTED THAT IS A GREAT DEAL MORE EXPENSIVE THAN SIMPLY CALLING FOR A LISTED UNIT. PLEASE CLARIFY. 4. Seal on Electrical drawings is dated 6/30/08, and is in different ink from that used by the Registrant to sign the seal. Registrant shall sign and date seal, and it's not June 30 yet. |
02/14/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. A registrant shall sign, date, and seal a professional document before the document is submitted to a client, contractor, any regulatory or review body. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. http://www.btr.state.az.us/regulations/rules.asp 2. Comment not addressed. Show how the exterior water piping is to be protected from freezing. Reference Section 313.6, UPC 2006. |
02/14/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. A registrant shall sign, date, and seal a professional document before the document is submitted to a client, contractor, any regulatory or review body. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. http://www.btr.state.az.us/regulations/rules.asp 2. Calculations not provided. Show how the A/C units AC-1 and AC-2 are being connected to the building structure and provide calculations to show that the building structure is not being adversely affected. Reference Section 302.1, IMC 2006. |