Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM04843
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/09/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Show how the exterior water piping is to be protected from freezing. Reference Section 313.6, UPC 2006. 3. Clarify the type and status (i.e. new or existing) of the receptor to be used for the termination of the condensate drains. If new, show how it is to be connected to the existing waste and vent system. Reference Section 103.2.3, UPC 2006. |
01/09/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
01/09/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Detail how the pumped condensate drains are to be combined and how reverse flow is to be prevented. Reference Section 106.1.1, IBC 2006. 3. Specify the insulation to be used for the chilled water piping on this project. Reference Section 503.2.8, IECC 2006 and Section 1204, IMC 2006. 4. Show how the A/C units AC-1 and AC-2 are being connected to the building structure and provide calculations to show that the building structure is not being adversely affected. Reference Section 302.1, IMC 2006. 5. Provide auxiliary drain pans or secondary drain systems for A/C units AC-1 and AC-2. Reference Section 307.2.3 IMC 2006. 6. Provide calculations demonstrating adequate ventilation. Reference Section 401.2, IMC 2006. 7. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference Section 503.2.7, IECC 2006. 8. Provide a description of item ST-1. Reference Section 106.1.1, IBC 2006. 9. Provide a rationale for the use of a CO2 monitor to control the operation of EF-1. Provide calculations to show that the hydrogen concentration will be kept below 1% of the room volume with this system (for the type of batteries noted in Section 502.4.1, IMC 2006) or provide continuous ventilation at 1 CFM per cubic foot of the total room volume. Reference Section 502.4, IMC 2006. 10. Show how the chilled water system can be drained. Reference Section 1206.2, IMC 2006. 11. Show how the hydronic piping is to penetrate the non-fire-rated building walls. Reference Section 1206.4, IMC 2006. 12. Provide justification for the use of compressed air to test the hydronic piping rather than hydrostatically testing the pipe per Section 1208.1, IMC 2006. (i.e. submit an appeal top the building official per Section 105.2, IMC 2006) |
01/22/2008 | GERRY KOZIOL | WWM | REVIEW | Passed | |
01/24/2008 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
01/25/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. AC-2 shall take a 15A CB, not a 20A, per the Schedule on Sheet M1. 2. Provide the conductor size for the branch circuit P-16, 18, on a 40A CB. 3. Specify a 400A fuse for the Chillers per the Schedule on Sheet M1. 4. Specify how power is being provided for IRC-1 through IRC-13. 5. Please add a note which requires that the generator be listed by an Independent Testing Laboratory. |
12/27/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
12/28/2007 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. EXISTING/DEMOLITION FLOOR PLAN NEEDS TO BE PROVIDED 2. DEFINE COMPOSITION OF EXISTING WALL BETWEEN REMODELED AREA AND EXISTING OFFICES ON THE WEST SIDE OF WORK AREA. PROVIDE UL ASSY MODEL NUMBER FOR 1 HOUR MIN FIRE RATING 3. ALL DRAWING LETTERING IS REQUIRED TO BE MIN HEIGHT OF 1/8" OR PROVIDE APPROVAL FROM BUILDING OFFICAL FOR USE OF 3/32" MIN HEIGHT LETTERING 4. JUSTIFY AND CLARIFY FIRE RATING ASSY BETWEEN FLOORS IN AREA OF NEW WORK 5. FIRE SPRINKLER/FIRE LINE SAFETY SYSTEM MUST BE PRESENTED WITH THIS PROJECT UNDER THE SAME PERMIT AS A DEFFERED SUBMITTAL. ALL DEFFERED SUBMITTALS MUST BE APPROVED BY THE BUILDING OFFICIAL. 6. DEFINE PHYSICAL ATTACHMENT OF TOP AND BOTTOM PLATES OF BOTH RATED AND NON RATED PARTITIONS; DETAILS 2AD-1, 7AD-1 AND 8AD-1 7. RECALCULATE REINFORCING IN TANK FOOTING, CHILLER FOOTING AND GENERATOR FOOTING INCLUDING TOP AND BOTTOM REINFORCING IN EACH DIRECTION. CALCULATIONS DO NOT MATCH FOIOTING SIZE INDICATED ON SHEET SD-1 |
12/28/2007 | DAVE MANN | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/31/2008 | CPIERCE1 | OUT TO CUSTOMER | Completed |