Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T07CM04567
Parcel: 14117007Q

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T07CM04567
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/29/2008 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. NEED STRUCTURAL CALCULATIONS
02/11/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide a copy of the approved shell drawings. Reference Section 106.1.1, IBC 2006.
2. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006.
3. Provide the architectural details for the fire-rated chases noted on sheets M1 and M2. Note that the construction shown on detail 2/M2 is not an approved fire-rated assembly. Reference Section 106.3.1, IMC 2006
4. Provide justification for the basis for the population and required outside air quantities used in the ASHRAE 62.1-2004 calculations; Table 6-1 does not provide values for kitchens.
5. Provide structural calculations and details to show that the Type I hoods are supported from the building structure in accordance with Section 507.6, IMC 2006.
6. Provide information and control wiring diagrams to show that the operation of the Type I hoods and the hood exhaust fans comply with Section 507.2.1.1, IMC 2006.
7. Provide a non-absorbent, non-combustible, cleanable surface (e.g. a sheet of stainless steel) between the hood and the gypsum board behind the hood. Reference Section 507.9, IMC 2006.
02/12/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. (see sheet C1)
2. The applicable energy code for all projects is the 2006 International Energy Efficiency Code with Local Amendments. (see detail 4/P1)
3. Provide water isometrics and waste and vent isometrics for the scullery area of the kitchen. Reference Section 103.2.3, UPC 2006.
4. Show how the reduced pressure zone backflow assemblies are drained. Reference Section 304.0, UPC 2006.
5. Based on the submitted water calculations, a ½" water supply to a water closet is undersized. Reference Section 610.1, UPC 2006.
6. Provide a floor drain in the kitchen. Reference Sections 411.2.2 and 704.3, UPC 2006.

7. Revise the size of the main natural gas pipe immediately downstream of the gas meter to comply with Section 1217.1, UPC 2006. Also, indicate the size of the gas manifold serving the fryers and range.
02/14/2008 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied See comments of 1/28/08.