Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM04536
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/11/2008 | HEATHER THRALL | ZONING | REVIEW | Needs Review | |
| 01/11/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Interlocking the restroom exhaust fans with the lights will allow the supply air to the restrooms to be recirculated. Reference Section 403, IMC 2006. 2. Provide calculations to show that the temperature of the assembly room can be maintained at 68 degrees Fahrenheit on a design winter day. Reference Section 309.1, IMC 2006. |
| 01/11/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | t07cm04536 1/11/07 1. Identify all exterior lighting fixtures on Lighting Plan. 2. Put Unit Heater on Ckt A-32 on the panel schedule. 3. Provide cut sheets for all exterior lighting fixtures. 4. Provide electrical requirements for the heat pump. 5. The heat pump, at 28.2 KVA per phase, would draw 235A. But this is a 30A circuit. Please clarify. 6. Panel schedule appears to be set up for KVA, not VA. Please clarify "VA per Phase" designation. 7. Show the location of Panel A on the plans. 8. Provide a statement describing the anticipated activities at this location. |
| 01/11/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | Water demand 12 GPM |
| 01/11/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. NEED SERVICE SINK AT 2'-10" FOR H/C ACCESSIBILITY 2. NEED BO APPEALO FOR WATER DISPENSER |
| 01/11/2008 | JASON GREEN | ENGINEERING | REVIEW | Needs Review | |
| 01/11/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The temperature and pressure relief shall not terminate into the tailpiece of a sink. 2. Provide a riser diagram for the revised waste and vent piping. 3. Show that the existing 3/4" water supply pipe can accomodate the proposed water demand. |
| 01/11/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
| 01/11/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 01/22/2008 | CAGUILA1 | WWM | REVIEW | Needs Review |