Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T07CM04263
Parcel: 14041055A

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T07CM04263
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/23/2008 GBONILL1 WWM REVIEW Needs Review
01/23/2008 MARTIN BROWN FIRE REVIEW Approved
01/23/2008 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
11/30/2007 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
11/30/2007 ROBERT SHERRY WATER REVIEW Approved
11/30/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. All traps shall be protected by a vent.
2. The minimum size of waste and vent piping is 1-1/4". Provide sizes conforming to Table 7-6, UPC 2006.
3. Show how the building sewer connects to the existing site sewer.
4. Provide a design for the water piping.
5. Provide fixture descriptions for all plumbing fixtures. Reference Section 401.1, UPC 2006
6. Provide lavatory faucets complying to to ARS Title 45, Chapter 1, Article 12. The maximum flow rate for lavatory faucets shall be no more than an average of one-half gallon of water per minute at a pressure of eighty PSI or they shall be equipped with a mechanism that causes the faucet to close automatically after delivering no more than one-fourth gallon of water.
7. Show that the floor of the restroom slopes toward the floor drain. Reference Section 411.2, UPC 2006.
8. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
11/30/2007 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied t07cm04263 11/30/07

1. Revise the minimum font size to 1/8" (all upper case).
2. Demonstrate that the Panel or Service feeding New Panel PL is not overloaded.
3. Provide overcurrent protection for the new feeder.
4. Provide fault current rating of new panel.
5. Provide utility available fault current, and fault calculations for new panel.
6. Demonstrate compliance with the Tucson Lighting Code, http://www.tucsonaz.gov/dsd/Codes___Ordinances/Tucson_Lighting_Code.pdf.
11/30/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Revise the minimum font size to 1/8" (all upper case).