Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T07CM04253
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/08/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; West District; 6,122 Square Feet Restaurant; $24,391.07 |
02/08/2008 | MARTIN BROWN | FIRE | REVIEW | Denied | Please include the following design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. |
02/11/2008 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Provide the model and size of the backflow preventer for the building water service. 2. Provide the size of the water meter used for the building water service and the water demand. |
02/12/2008 | GERRY KOZIOL | WWM | REVIEW | Approved | |
02/21/2008 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Buffalo Wild Wings T07CM04253 Building Plan (1st Review) TRANSMITTAL DATE: February 21, 2008 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved tentative plat/development plan. Please submit two copies of the approved and stamped tentative plat/development plan, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t07cm04253.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approved and stamped tentative plat/development plan and additional requested documents |
02/28/2008 | JASON GREEN | ENGINEERING | REVIEW | Denied | Building Plan can not be approved prior to Tentative Plat (S07-101) and grading plan approval. Engineering could not verify that the building plan was in compliance with an approved tentative plat/development plan. Please submit two copies of the stamped approved tentative plat/development plan, landscape, and NPPO plans with the next building plan submittal. Engineering will re-review the building plan on the next submittal to insure compliance with the stamped approved Tentative Plat. Additional comments may be forthcoming. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/11/2008 | CPIERCE1 | OUT TO CUSTOMER | Completed |