Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T07CM04081
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/19/2007 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approv-Cond | Conditionally approved - approval pending signature of Floodplain Use Permit and Conditions. November 19, 2007 FLOODPLAIN USE PERMIT # T07OT02609 PROJECT ADDRESS: 3040 N Campbell Avenue, Suite #100 APPLICANT'S NAME: SLM Architects PROPERTY OWNER: Paul and Sandra Guglielmo The applicant is authorized to use a portion of the flood hazard area in the City of Tucson, Arizona, on the property described as: 3040 N Campbell, Tucson, AZ 85719, CAMPBELL AVE ACRES LOT 2 EXC PT N42.15' W150' & LESS w 10' FOR RD WIDENING BLK 5. In a portion of Township 13 South, Range 14 East, Section 32, for professional interior office remodel. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard, and Watercourse Amenities, Safety and Habitat regulations, and are particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, County, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit. The following 6 conditions apply to this permit: 1) This permit becomes invalid and is subject to additional floodplain review, if any required development permit changes the configuration of the improvement, or, if there is any further disturbance within the floodplain other than that outlined in this application. This floodplain use permit may be subject to conditions or restrictions designed to reduce or mitigate the potential damage or hazard to life or property resulting from development within the regulatory floodplain, floodway or erosion hazard areas as determined by the project engineer and accepted by the City of Tucson. 2) This parcel lies in a FEMA - Zone AE. Therefore, the proposed development is subject to substantial improvement requirements. Substantial Improvement means any reconstruction, repair, rehabilitation, addition or other improvements of a structure, the cost of which equals or exceeds fifty (50) percent of the market value of the structure before the "start of construction" of the improvements. This term includes structures, which have incurred "substantial damage" regardless of the actual repair work performed. Per Sec. 26-4.1 Nonconforming development. (a) Improvements to, or Reconstruction of, Existing Nonconforming Development: (1) Any structure which is substantially improved at a cost equal to or exceeding fifty (50) percent of the full cash value of the structure as shown on that latest assessment rolls of the county assessor wither (a) before the improvement or repair is started, or (b) if the structure has been damaged and is being restored, before the damage occurred, shall conform to these regulations. At the time of improvement or reconstructing the structure or development, floodproofing (non-residential structures only) may be considered as one of the means if bringing it in compliance with this chapter. The proposed improvement is considered a substantial improvement since the house is located within a FEMA Zone AE and does not a have an elevation certificate on file. The cost of the improvements is estimated at $129,433.69. The current assessed value of the structure is $427,435.00. 3) Within 5 (five) days of issuance of this permit, and through completion of the project, notification must be posted and maintained in a conspicuous place on the job site stating "CONSTRUCTION PROCEEDING UNDER REQUIREMENTS OF CITY OF TUCSON FLOODPLAIN USE PERMIT # T07OT02609 FOR INFORMATION PLEASE CALL 791-5550." 4) This Floodplain Use Permit and plans shall be kept in a readily accessible location on site at all times. 5) Any additional future disturbance of the floodplain shall have separate floodplain use permit applications submitted to this office for review and approval. 6) See the associated activity T07CM04081. This Floodplain Use Permit will be automatically revoked and becomes invalid for non-compliance to conditions set forth in this permit. Also, this permit will expire one year from its date of issue. Renewal of this permit will require a new application, review and approval of that application by the City of Tucson, Development Services Department, Engineering Division. (EXPIRATION DATE) Month: 11 Day: 19 Year: 2008 APPLICANT/CONTRACTOR: SLM Architects ADDRESS: PO Box 26126, Tucson, Arizona 85726 PHONE: (520) 790-1314 OWNER: Paul and Sandra Guglielmo ADDRESS: 3497 N Campbell, Tucson, Arizona 85719 PHONE: (520) 616-2211 SIGNATURE OF APPLICANT DATE The applicant is authorized by the City Engineer to receive a floodplain use permit subject to the above referenced conditions and restrictions. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/29/2007 | SUE REEVES | APPROVAL SHELF | Completed |
11/29/2007 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |