Permit Review Detail
Review Status: Completed
Review Details: MODULAR BUILDINGS
Permit Number - T07CM04047
Review Name: MODULAR BUILDINGS
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/12/2007 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 10/12/2007 | MICHAEL ST. PAUL | ZONING | REVIEW | Passed | |
| 10/16/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | t07cm04047 10/16/07 1. Provide a grounding electrode system at the service entrance. 2. Address the grounding requirements for Second Building per NEC 250.32. 3. Document disconnecting means at the modular panels. Reference NEC 225.31. 4. Define the "Specialty Systems" run to the classroom wing. Specify the termination of the conduit at both ends. If the intent is for future use, designate so on the plans, otherwise provide more information. 5. Apply for an overhead electrical service waiver. |
| 10/16/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 10/16/2007 | RBROOKS1 | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PROVIDE THE SETBACS FROM THE STRUCTURE TO THE PROPERTY LINE. 2. NOTE THAT 2 EXITS ARE REQUIRED FROM THE STRUCTURE. BOTH WILL HAVE TO BE ACCESSIBLE (RAMP). |
| 10/16/2007 | RSHERRY1 | WWM | REVIEW | Passed | No connection to the public sewer |
| 10/16/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 10/16/2007 | ROBERT SHERRY | WATER | REVIEW | Passed | |
| 12/17/2007 | DAVE MANN | FIRE | REVIEW | Approved | |
| 12/17/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |