Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM04040
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/15/2007 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 11/05/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006. 2. Provide water supply isometrics. Reference Section 103.2.3, UPC 2006. 3. Provide a natural gas piping design, including the piping layout on a floor plan and a natural gas schematic showing the sizes, loads and developed lengths of the piping. Reference Section 103.2.3, UPC 2006. 4. Provide the minimum plumbing facilities (i.e. a drinking fountain) required by Table 2902.1, IBC 2006, for business occupancy. 5. Provide information to show that the hub drain complies with Sections 411.1 and 804.1, UPC 2006. 6. Show how the new water piping relates to the existing water supply system and show that the additional connections do not cause the existing piping to be overloaded. (Note that while the site plan for the shell building indicates that a 2" water meter was planned for the overall building, a 1" meter was actually installed according to Tucson Water.) Reference Section 101.5.1, UPC 2006. 7. Show the locations of the intake/vent openings for the water heaters and show how they comply with their listing and the manufacturer's installation instructions. Reference Section 512.0, UPC 2006. 8. Provide backflow protection for the water filter installation. Reference Section 603.0, UPC 2006. 9. Provide separate indirect waste pipes for each food-handling fixture (i.e. do not manifold the indirect waste piping). Reference Section 801.2.3, UPC 2006. 10. Provide information to show that the proposed gravity grease interceptor complies with the requirements of ASME A112.14.3-2000 and IAPMO PS 80 2003b. If the interceptor is located in a traffic area, provide the traffic rating for the installation. Reference Section 1014.3.3, UPC 2006. 11. Provide the sizing calculations for the gravity grease interceptor. Reference Section 1014.3.6.1, UPC 2006. |
| 11/05/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 11/05/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006. 2. Provide the installed weight of the rooftop unit, RTU-1. Reference Section 106.3.1, IMC 2006. 3. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Reference Section 302.1, IMC 2003. 4. Show the size, routing, and termination of the condensate drain for RTU-1. Terminate condensate drains in accordance with Section 307.2.1, IMC 2003, as amended by the City of Tucson. Reference Section 307.2, IMC 2006. 5. Control of the restroom exhaust fan with the restroom light switch will result in complete recirculation of the air supplied to the restroom when the lights are turned off. Complete recirculation of ventilation air from toilet rooms is prohibited. Reference Section 403.2.1 (3), IMC 2006. 6. Provide information to show that the grease exhaust duct complies with the requirements of Section 506, IMC 2006 for construction, support, and clearances. 7. Provide a Type I hood over the conveyor oven. Reference Sections 507.1 and 507.2, IMC 2003. 8. Provide structural calculations and details of the attachment to the building structure to show that the hood is supported in accordance with Section 507.6, IMC 2003. |
| 11/06/2007 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. NEED LETTER OF APPROVAL FROM BUILDING OFFICAL TO SUBSTITUTE BOTTLED WATER FOR "EWC". 2. TOILET ROOM DOOR MUST HAVE 18" CLEARANCE ON STRIKE SIDE IF IT HAS A CLOSER AND A LATCH. FIRE EXTINGUISHER WILL INTERFEAR WITH CLEARANCE. DEFINE DOOR SPECIFICATIONS. 3. IT MIGHT BE BETTER TO USE AN "M" CLASSIFICATION FOR THIS FACILITY. THIS WILL COVER ALL OCCUPANCY TYPES NEEDED. WAITING AREA IS PART OF AIRPORT TERMINAL CLASSIFICATION, NOT A PIZZA PARLOR. THE TOILET ROOM SHOULD BE INCLUDED IN THE KITCHEN CLASSIFICATION. REWORK OCCUPANCY LOADS. 4. DETAIL 2/A-2 NEEDS A STEEL LINTEL OVER OPENING, PROVIDE STRUCTURAL CALCULATIONS. |
| 11/07/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006. 2. Provide electrical requirements for WH. 3. Provide a disconnecting means for the Walk-In Cooler on Ckt A-34. 4. Review incomplete. Numbers on panel schedule not legible. Too small and smudged. Plans Examiner to review Floor Plan - Power, panel schedule, and keynotes on One Line Diagram after Comment #1 above is satisfied. 5. Sign circuit does not appear to coordinate with the description on Sheet A-6. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/26/2007 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 11/26/2007 | DELMA ROBEY | REJECT SHELF | Completed |