Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM03763
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/12/2007 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 10/12/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Revise the ventilation calculations per Secions 403.3 and 403.3.2, IMC 2006. If the categories shown in Table 403.3 are not suitable for the occupancies in this activity, provide an engineering analysis for the ventilation as an appeal to the building official. |
| 10/12/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide an approved appeal to the building official to address the lack of a drinking fountain. |
| 10/12/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 10/12/2007 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Justify new post size, footings for new posts, beam size, and joists for added square footage at mezzanine. 2) Detail for new ceiling and pot shelf 12/A3.0 gives no information for construction or inspection. Please add all required information. (joist sizing, spacing, connections, etc) |
| 10/12/2007 | DAVE MANN | FIRE | REVIEW | Approved | |
| 10/15/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | T07CM03763 10/15/07 1. Show HP-1 on electrical plans, along with disconnecting means and conductor sizing. 2. Protect HP-1 according to its MOCP of 15A. 3. Water Heater, wire size #10 per manufacturer recommendation on cut sheet. This may take a 30A circuit. 4. Provide a disconnecting means for both water heaters, and/or demonstrate that they are cord-connected. 5. There is a switch on circuit 4, the circuitry of which does not connect to anything. Please clarify. FOLLOWING COMMENTS STILL FROM PREVIOUS REVIEW, TO BE REVIEWED. RECHECK ALL BRANCH CIRCUITS. 5. For Phase A, 16050VA at 120V would be 134A, not 67. Phase appears overloaded. Concept applies to Phase C as well. 6. Count 25% of largest motor on panel schedule. 7. Add new heat pump to Service calculation. 8. Add water heaters to Service Load Calculations. 9. Add 7.5 KW for the Fan Coil Unit to Service Load Calculations. 10. Provide electrical line diagram including all panels on electrical service, and add them to Service Load Calculations. |
| 10/16/2007 | GBONILL1 | WWM | REVIEW | Needs Review | |
| 10/16/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 10/16/2007 | PAUL MACHADO | ENGINEERING | REVIEW | Approved |