Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM03736
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/28/2007 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 09/28/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide the ventilation required for the restroom (75 CFM per water closet). |
| 09/28/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a trap and vent for the trench drain. 2. Comment not addressed. Provide the sizes of the flues for the water heater and the unit heater. Provide sufficient information to show that they are properly sized and terminated. |
| 09/28/2007 | ROBERT SHERRY | WATER | REVIEW | Denied | Comment not addressed. Show the location and size of the required reduced pressure backflow preventer. |
| 10/01/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T07CM03736 10/01/07 1. Indicate electrical requirements for Water Heater. Reference Sheet A3, General Mechanical Note 3. 2. Mechanical shall provide Heat Pump specifications and electrical requirements. 3. Mechanical shall provide Unit Heater Blower specifications and electrical requirements. 4. Provide fixture cut sheets for all exterior lighting. 5. Demonstrate compliance with Tucson Lighting Code. 6. Provide a lighting fixture schedule on the plans, with electrical requirements for all lighting fixtures. 7. Provide electrical requirements for the ceiling fans. 8. Demonstrate compliance with NEC 700.12 (F) regarding the circuiting of the exit and egress lighting. 9. Circuit 30 has a receptacle on the Electrical Plan. This is a spare on the panel schedule. Please clarify. |
| 10/02/2007 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
| 10/02/2007 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 10/02/2007 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 10/15/2007 | DROBEY1 | WWM | REVIEW | Needs Review | |
| 10/15/2007 | DROBEY1 | BUILDING-COMMERCIAL | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/15/2007 | DELMA ROBEY | APPROVAL SHELF | Completed |
| 10/15/2007 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 10/15/2007 | DELMA ROBEY | REJECT SHELF | Completed |