Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM03736
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/14/2007 | CAGUILA1 | ZONING | REVIEW | Needs Review | |
| 09/14/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Specify the size of the dryer vent. 2. Show how the evaporative coolers are to be drained and how the drains are to be terminated. 3. Show the size, route, and terination of the condensate drain from the ductless A/C unit. 4. Provide ventilation for the restroom. 5. Show that there is adequate natural ventilation for the spce during the heating season. Reference Section 402, IMC 2006. |
| 09/14/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T07CM03736 9/14/07 1. Size the overcurrent protective device for the dryer per NEC 422.11 (E). 2. Provide a lighting fixture schedule. 3. Demonstrate compliance with the Tucson Lighting Code. 4. Fans are on Ckt 22, not Spare. 5. Circuit the unit equipment for emergency illumination according to the requirements of NEC 700.12 (E). 6. Provide a disconnecting means for the indoor HP unit. 7. Provide an electrical circuit for the HP. 8. Show the location of Panel A on the plans. |
| 09/14/2007 | ROBERT SHERRY | WATER | REVIEW | Denied | Show the location and size of the required reduced pressure backflow preventer. |
| 09/14/2007 | CAGUILA1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
| 09/14/2007 | CAGUILA1 | WWM | REVIEW | Needs Review | |
| 09/14/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide the water and the waste & vent riser diagrams. 2. Coordinate the gas input to the unit heater with the specified unit heater (250,000 BTUH rather than 247,300 BTUH). 3. Revise the size of the gas piping per Table 12-8, UPC 2006. 4. Clarify the nature of the specified sinks. 5. Table 6-4, UPC 2006 has nothing to do with pipe sizing. 6. Provide the sizes of the flues for the water heater and the unit heater. Provide sufficient information to show that they are properly sized and terminated. 7. Explain the grate shown on the plumbing floor plan. Is it a plumbing fixture? 8. Provide heat traps for the water heater if it has not been equipped with integral heat traps. 9. Provide insulation on the first 8' of CW and HW piping from the water heater if integral heat traps have not been used. |
| 09/14/2007 | CAGUILA1 | ENGINEERING | REVIEW | Needs Review | |
| 09/14/2007 | DAVE MANN | FIRE | REVIEW | Approved | |
| 09/14/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |