Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T07CM03497
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/03/2008 | BUREAU VERITAS | 2ND PARTY REVIEW | REVIEW | Approved | |
| 11/13/2007 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | An approved site plan by all reviewing agencies is required prior to site plan approval. |
| 12/03/2007 | VFLORES1 | 2ND PARTY REVIEW | REVIEW | Approved | |
| 12/03/2007 | DAVID RIVERA | ZONING | REVIEW | Denied | 12-03-07 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. Zoning has reviewed the building plans but cannot approve them at this time until the plans have been completely approved through the commercial review process and complies with the CDRC approved and stamped development plan. 2. While the previous comment related to site card and site approval is no longer a requirement, two copies of the CDRC approved and stamped development, landscape and NPPO plans are to be included with the building plan package. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval. 3. Zoning will re-review the building plans on the next submittal provided the requested plans are included with the building plan package and the building structural portions of the plan review have been approved. 4. As of this review date the Development plan (D07-0006) under the CDRC review process has not been approved. |
| 12/04/2007 | DAVE MANN | FIRE | REVIEW | Approved | |
| 12/05/2007 | GERRY KOZIOL | WWM | REVIEW | Denied | needs manhole tap permit |
| 12/10/2007 | ROBERT SHERRY | WATER | REVIEW | Approved |