Permit Number: T07CM03497
Parcel: 14029212B

Review Status: Completed

Review Details: RESUBMITTAL - SITE ALL

Permit Number - T07CM03497
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/13/2007 DAVE MANN FIRE REVIEW Approved
11/29/2007 JASON GREEN ENGINEERING REVIEW Denied November 29, 2007

Development Services Department
Engineering Review Section

1. Engineering cannot approve the site plan until CDRC has completed the review and approved the development plan.

2. The approved development plan is required before the site plan can be approved by Engineering. Two copies of the CDRC approved development plan, landscape and NPPO plans are to be submitted with the site plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for approval stamps. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the site plan packet processed together for site approval.

3. As of this review date the Development plan (D07-0006) under the CDRC review process has not been approved.
12/03/2007 PETER MCLAUGHLIN NPPO REVIEW Needs Review
12/03/2007 DAVID RIVERA ZONING REVIEW Denied 08/30/07

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. Zoning cannot stamp the development plan as a site plan until CDRC has completed the review and approved the plan.

2. While the previous comment related to site card and site approval is no longer a requirement, two copies of the CDRC approved and stamped development, landscape and NPPO plans are to be included with the building plan package.

A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval.

3. As of this review date the Development plan (D07-0006) under the CDRC review process has not been approved.
12/03/2007 DAVID RIVERA ZONING HC SITE REVIEW Denied
12/03/2007 PETER MCLAUGHLIN LANDSCAPE REVIEW Needs Review
12/07/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Coordinate the layout of the building sewer as shown on sheet C-3 with the building sewer as shown on sheet P1.0. Reference Section 103.2.3, UPC 2006.
2. A separate permit is required for the installation of a building sewer that includes a private manhole. See: http://www.tucsonaz.gov/dsd/Forms_Fees___Maps/Fees___Instructions/pdeq_flow_chart_A4.pdf