Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T07CM03497
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/24/2007 | DAVE MANN | FIRE | REVIEW | Denied | The fire turn radius on Sheets A1, A1.1 go over the curbs. Remove the RP valve on the fire line on sheet C3 and show hydrant locations. On sheet A-1 the vertical clearance shall be 15 feet. |
| 08/29/2007 | SREEVES1 | ADA | REVIEW | Passed | not a COT project |
| 08/30/2007 | DAVID RIVERA | ZONING | REVIEW | Denied | 08/30/07 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. Zoning cannot stamp the development plan as a site plan until CDRC has completed the review and approved the plan. 2. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval. 3. As of this review date the Development plan (D07-0006) under the CDRC review process has not been approved. |
| 08/30/2007 | DAVID RIVERA | ZONING HC SITE | REVIEW | Denied | see zoning comments |
| 09/17/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The rim elevation of the next upstream sanitary manhole (2628.11) is less than 12" below the first floor elevation (2628.90). Provide a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson. 2. Coordinate the location of the water service entrance and the direction of flow for the building sewer as shown on the site plan with the building plumbing plans. |
| 09/21/2007 | PETER MCLAUGHLIN | LANDSCAPE | REVIEW | Denied | 1. Provide a copy of the approved development plan, landscape plan and Native Plant preservation plan with the next site plan submittal. |
| 09/21/2007 | PETER MCLAUGHLIN | NPPO | REVIEW | Denied | see landscapr comments |
| 09/21/2007 | JASON GREEN | ENGINEERING | REVIEW | Denied | 9-21-07 Development Services Department Engineering Review Section 1. Engieering cannot stamp the development plan as a site plan until CDRC has completed the review and approved the plan. 2. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the site plan can be approved by Zoning. Two copies of the CDRC approved development plan, landscape and NPPO plans are to be submitted with the site plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the site plan packet processed together for site approval. 3. As of this review date the Development plan (D07-0006) under the CDRC review process has not been approved. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/25/2007 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 09/25/2007 | CINDY AGUILAR | REJECT SHELF | Completed |