Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM03379
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/14/2007 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
08/14/2007 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
08/15/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/15/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, International Building Code, 2006. |
08/15/2007 | CHRIS KIEL (WILDAN) | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Please revise the door swing at room 1139 to provide the minimum maneuvering clearance for the pull side of the door per section 404.2.3 of ANSI 117.1-2003. In addition, please provide additional information regarding the new doors in rooms 1142 and 1149 to verify compliance with section 404.2.3. The lavatory in room 1149 appears to be within the maneuvering clearance. 2) Please provide additional information regarding the new sinks/lavatories in order to verify compliance with section 1109.3 of the 2006 IBC and section 606 of ANSI 117.1-2003. 3) Please provide verification that 20% has been spent upgrading the accessibility of the altered primary function areas in accordance with section3409.7 of the 2006 IBC. Please list the total valuation and detail the expenses associated with the accessibility upgrades. |
08/15/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/15/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, International Building Code, 2006. 2. Specify the insulation to be used on the HW and HWR piping. |
08/27/2007 | GBONILL1 | WWM | REVIEW | Needs Review | |
08/27/2007 | GBONILL1 | FIRE | REVIEW | Needs Review | |
08/27/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |