Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T07CM03346
Review Name: OTHER
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/22/2007 | CHRIS KIEL (WILDAN) | BUILDING-COMMERCIAL | REVIEW | Approved | |
08/22/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
08/22/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide information to show the basis for the sizing of ET-2 (e.g. total water volume, temperatures, pressures, any freeze protection chemicals) |
08/23/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Please provide fault calculations for both new and existing equipment. 2. Provide fault current rating of Panel PH. 3. Provide location of Panel PH on the plans. 4. Existing Wireway powers Panel K2. Is this Panel PH? 5. Provide overcurrent protection sizing for the feeders to the new equipment. 6. The #2 GND in both sets of the new and existing runs to the new Motor Control Center shall be sized at a minimum of #1. Reference NEC 250.122 (F) (1). 7. Demonstrate compliance with NEC 110.16 (C) (2) (c). Show exact location of required entrance on plans. Specify the panic hardware required by 110.26 (C) (2). 8. Reference Sheet Motor Schedule, Starter, Fuse Overload. Each motor shall have a separate overload device per NEC 430.32. 9. Please submit information as to whether the Air Cooler Chiller has an Hermetic Refrigerant Motor-Compressor, and specific fusing information at the Starter. Plans Examiner to evaluate for circuit protection according to Article 430 and/or 440, as applicable. |
08/30/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |