Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T07CM03341
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Coordinate the termination of the roof drain leaders: detail 5/A7appears to terminate both the roof drain and the overflow with downspout nozzles over the sidewalk but sheet ASP-1 calls for termination with sidewalk scuppers. The overflow leader may terminate over a sidewalk with a downsout nozzle but the roof drain leader may not discharge onto a sidewalk. 2. Provide overflow capacity for the two scuppers draining the raised roof section on building 1. 3. The minimum width for each of the scuppers for building 2 is 12.57". Clarify the scupper width on detail 12/A7 and the call-out on sheet A2.1. The 5" downspout is adequate. |
01/07/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/11/2010 | SUE REEVES | OUT TO CUSTOMER | Completed |