Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM03336
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/10/2007 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 08/10/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide a sealed mechanical drawing. 2. Show how the ventilation for the waiting oom will be changed due to the expansion of the room. 3. Provide a design for the support for the A/C unit. 4. Show how the condensate from the A/C unit will be disposed. |
| 08/10/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 08/10/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/10/2007 | CHRIS KIEL (WILDAN) | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Please provide additional information regarding the rated wall assemblies and relocated doors at the south stairwell in order to verify compliance with chapter 7 of the 2006 IBC. 2) Please provide the total valuation and the value of the work done to increase accessibility on the plans in order to verify compliance with section 3409.7 of the 2006 IBC. 3) Please revise the tenant space occupancy group per chapter 3 of the 2006 IBC (B vs. M). 4) Please seal all sheets in accordance with the submittal requirements of the City of Tucson. |
| 08/10/2007 | RSHERRY1 | WWM | REVIEW | Passed | |
| 08/10/2007 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 08/10/2007 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
| 09/05/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T07CM03336 8/10/07 1. Please have Mechanical Engineer clarify power requirements for the new AC unit. The specifications call for a minimum disconnect size, which is not typically specified. Please provide power consumption requirements, MOCP, and MCA as applicable. 2. Mechanical has specified a 240V AC. Electrical has provided 208V power. Coordinate with Mechanical and clarify. 3. Mechanical shall sign and date seal to incorporate AC into scope of work. |
| 09/05/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |