Review Status: Completed
Review Details: RESUBMITTAL - SITE
Permit Number - T07CM03292
Review Name: RESUBMITTAL - SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/11/2010 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
| 03/11/2010 | RONALD BROWN | ZONING HC | REVIEW | Approved | |
| 03/12/2010 | ANDREW CONNOR | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Andrew Connor: Landscape and Zoning Review Section PROJECT: T07CM03292 TRANSMITTAL DATE: 03/12/2010 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. When the side(s) of a parking space abuts any vertical barrier over six (6) inches in height, other than a vertical support for a carport, the required width for the space is ten (10) feet to provide extra width to allow passengers to enter and exit the vehicle on the side where the barrier exists DS 3-05.2.1.3. Provide & dimension required 10' parking space (# 15) on the site and landscape plans. 2. Short term bicycle parking must provide a two point support system and allows the user to securely lock the frame and wheels. The support system must be at least 18" wide to facilitate locking in this manner. Revise as necessary. 3. The site plan and landscape plan must show identical site layout to avoid conflict between the two plans. Ensure that all changes to the site plan are reflected on the landscape plan. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
| 03/18/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Fourth request, comment not addressed. Provide approved justification for not connecting the building sewer to the public sewer from PDEQ. |
| 03/30/2010 | PAUL MACHADO | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/03/2010 | DELMA ROBEY | OUT TO CUSTOMER | Completed |