Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM03219
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/02/2007 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 08/02/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide calculations to justify the use of 3 5-ton air conditioners for this tenant space. 2. Revise the termination of the condensate drains. 3. Provide the ventilation calculations. 4. Show the locations of all thermostats. |
| 08/02/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T07CM03219 8/2/07 1. Demonstrate that the Insta-Hot is cord-connected to a standard duplex receptacle. 2. Insta-Hot power requirements call for 20A, which would be 2400VA, not 1500. A 25A or 30A circuit would also be adequate. 3. HP-2 and HP-3 appear to be switched on the Power Plan. Reference NEC 408.4. 4. Provide size of the overcurrent protection for Panel 130 feeder. 5. Provide fault calculations for new panel. |
| 08/02/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/02/2007 | CHRIS KIEL (WILDAN) | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Please revise the title to reference the scope of work as shell improvements per the submittal requirements for the City of Tucson. 2) Please revise the code references to the currently adopted codes per section 106.1.1 of the 2006 IBC (i.e. 2006 I-codes and ANSI 117.1-2003). 3) Please specify the rear water closet grab bar placement in relation to the side wall per section 604.5 of ANSI 117.1-2003. 4) Please be aware that the future tenant improvement may require additional plumbing fixtures in accordance with table 2902.1 of the 2006 IBC (i.e. drinking fountain, mop sink, separate sex restrooms, etc.). 5) Please provide verification that the lavatory in not within the required clear floor space in accordance with section 604.3.2 of ANSI 117.1-2003. 6) Please verify the height of the tile wainscot around the water closet in order to verify compliance with section 1210.2 of the 2006 IBC. 7) Please provide structural verification that the existing structural components can support the new mechanical units per section 106.1.1 of the 2006 IBC. In addition, please specify the weight of the new mechanical units on the plans per section 106.1.1. |
| 08/02/2007 | ANY | ENGINEERING | REVIEW | Approved | |
| 08/02/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide the minimum plumbing fixtures required by Chapter 29, IBC 2006. 2. Show how the water temperature at the lavatory will be limited to 110 degrees Fahrenheit. 3. Limit the water pressure to no more than 80 PSI. 4. Lavatory faucets shall be equipped with a mechanism that causes the faucet to close automatically after delivering no more than one-fourth gallon of water or shall be designed to deliver no more than an average of one-half gallon of water per minute at a pressure of eighty PSI. |
| 08/06/2007 | CAGUILA1 | WWM | REVIEW | Needs Review | |
| 08/06/2007 | CAGUILA1 | FIRE | REVIEW | Needs Review | |
| 08/06/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |