Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T07CM03029
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/10/2007 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; Central District; 9,625 Square Feet of Warehouse; $7,605.77 |
12/10/2007 | DAVID BELL | LANDFILL | REVIEW | Approved | |
12/10/2007 | MARTIN BROWN | FIRE | REVIEW | Denied | Please include the following design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. Also, reference is made to existing fire hydrants. Please include approved water plan from Tucson Water. Clarify Fire Department Connection location for ware house. |
12/11/2007 | TERRY STEVENS | ZONING | REVIEW | Denied | 12/12/07 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. |
12/11/2007 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a letter from Tucson Water confirming that the use of a 5/8" water meter (¾" water meters are not available from Tucson Water) will be allowed for this project (20 fixture units equates to a demand of 14 GPM) |
12/19/2007 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | DATE: December 19, 2007 SUBJECT: Warehouse TO: LOCATION: 1953 W Grant Road, T14S, R13E, Section 3, Ward 1 REVIEWERS: Bianca Ramirez, CFM ACTIVITY: T07OT03029 (First Review) RESUBMITTAL REQUIRED: Building Plan SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed building plan for the above referenced property. Engineering Division has approvd the building plan. Please take note of the following review comments Building Plan 1. Approval for building only. Must comply with zoning requirements - proposed building location must match approved development plan location. Zoning will verify. 2. Construction for building may not begin until development plan has been approved. In addition, if grading permit is required it will also need to be approved prior to start of construction. If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov Bianca C. Ramirez Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 837-4928 office (520) 879-8010 fax |
12/20/2007 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. SHC OFFICE- BUILDING #1 2. NEEDS WASTEWATER 8TH FL REVIEW & APPRV OF LOCATION/METHOD OF CONNECTION (EXISTING PRIVATE SEWER) |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/21/2007 | CINDY AGUILAR | APPROVAL SHELF | Completed |
12/21/2007 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |