Permit Number: T07CM03018
Parcel: 12809005E

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T07CM03018
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/15/2008 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T07CM03018 1/15/07

1. Show both the Air Handler and Condensing Unit on the Power Plan. Reference Sheet M-1.
2. Equipment disconnect on Power Plan is circuited on A-22,24, which is a space on the panel schedule. Please clarify.
3. Condenser at 125% would be 3750 VA per phase, not 2325. This drives the highest phase up to 67A, which overloads the feeder circuit for the panel.
4. Provide circuits for all lighting fixtures.
5. Show Service Entrance Section and Panel A on scaled drawing. Need to verify 300' between them.
01/15/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Show the size, route, and termination of the condensate drain from AH-1.
2. Show the required insulation R-value for the ductwork.
3. Show how the ductwork is actually to be built (i.e. flex vs. rigid duct).