Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T07CM03018
Review Name: REVISION - - 1ST
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/15/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T07CM03018 1/15/07 1. Show both the Air Handler and Condensing Unit on the Power Plan. Reference Sheet M-1. 2. Equipment disconnect on Power Plan is circuited on A-22,24, which is a space on the panel schedule. Please clarify. 3. Condenser at 125% would be 3750 VA per phase, not 2325. This drives the highest phase up to 67A, which overloads the feeder circuit for the panel. 4. Provide circuits for all lighting fixtures. 5. Show Service Entrance Section and Panel A on scaled drawing. Need to verify 300' between them. |
| 01/15/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show the size, route, and termination of the condensate drain from AH-1. 2. Show the required insulation R-value for the ductwork. 3. Show how the ductwork is actually to be built (i.e. flex vs. rigid duct). |