Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T07CM03013
Parcel: 13337017F

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T07CM03013
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/17/2007 MICHAEL ST. PAUL ZONING REVIEW Approved
07/17/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006.
2. Coordinate the duct insulation requirements shown on sheet M2.1 with the Specifications shown on sheet M3.2. The minimum duct insulation shall conform to the requirements of Section 503.2.7, IECC 2006.
3. Coordinate the balancing requirements shown on sheet M2.1 with the specifications on sheet M3.3. The final balance shall ensure that adequate ventilation is provided to the project areas.
4. Clarify the note regarding the electric wall heaters noted on sheet M2.1 but not shown on either the mechanical or electrical designs.
07/17/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006.
2. Complete the water calculations shown on sheet P2.1.
3. Clarify the arrangement for the exam room sinks - tempered water (TMV-1) or instantaneous water heater (detail 3/P2.1)? There is no electrical service for any water heaters.
4. Provide specifications for the exam room sinks. The specifications for water closets for use in Puerto Rico are not required.
07/17/2007 ROBERT SHERRY WATER REVIEW Approved
07/17/2007 CHRIS KIEL (WILDAN) BUILDING-COMMERCIAL REVIEW Denied 1) Please revise the text within the plans to be a minimum of 1/8" in height and all capital letters in accordance with the submittal requirements for the City of Tucson.
07/17/2007 LOREN MAKUS ENGINEERING REVIEW Approved
07/31/2007 VFLORES1 ELECTRICAL-COMMERCIAL REVIEW Needs Review
07/31/2007 VFLORES1 WWM REVIEW Needs Review
07/31/2007 VFLORES1 FIRE REVIEW Needs Review
07/31/2007 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review