Permit Number: T07CM02917
Parcel: 13314236C

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T07CM02917
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/12/2007 CHRIS KIEL (WILDAN) BUILDING-COMMERCIAL REVIEW Denied 1) Please coordinate the ceiling heights within detail 3/A1 per section 106.1.1 of the 2006 IBC.

2) Please indicate on the plans the total costs associated for this project ans show that either 20% of the cost has been spent increasing accessibility or that the facility is fully accessible per section 3409.7 of the 2006 IBC.

3) Please revise the swing of the egress doors to the direction of egress travel per section 1008.1.2 of the 2006 IBC.

4) Please provide additional information regarding the location of exit signage and emergency power for egress illumination in accordance with sections 1011 and 1006.3 of the 2006 IBC for the entire tenant space. Please be sure to provide the emergency power for the lights on the exit discharge side of the required exits.
07/12/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Confirm the capability of the existing air conditioning unit to provide the specified air flow quantities.
2. Provide calculations to show that the revised ductwork will distribute the specified air flow quantities within the capabilities of the existing air conditioner.
3. Provide smoke detectors in the return air duct, upstream of any outside air connections, for all air distribution systems with a capacity greater than 2,000 CFM. Reference Section 606.1, IMC 2003.
4. Provide calculations demonstrating adequate ventilation. Reference Section 401.2, IMC 2003.
07/12/2007 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T07CM02917 7/12/07

1. Provide a circuit for the exhaust fan and restroom light.
2. Provide lighting fixture schedule, not just a symbol legend.
3. Electrical Plans has receptacles on new Ckt 9. This is a spare on the panel schedule.
4. Fill out the panel schedule, not using crossouts and arrows, for over-the-counter service and approval.
5. Certain existing lights appear in conflict with new walls. New walls appear to go up to ceiling.
07/12/2007 ROBERT SHERRY WATER REVIEW Approved
07/12/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
07/20/2007 GBONILL1 WWM REVIEW Needs Review
07/20/2007 GBONILL1 ZONING REVIEW Needs Review
07/20/2007 GBONILL1 ENGINEERING REVIEW Needs Review
07/20/2007 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
07/20/2007 GBONILL1 FIRE REVIEW Needs Review