Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE ALL
Permit Number - T07CM02857
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/09/2008 | RONALD BROWN | ZONING HC SITE | REVIEW | Approved | |
| 10/10/2008 | PETER MCLAUGHLIN | LANDSCAPE | REVIEW | Approved | |
| 10/14/2008 | PETER MCLAUGHLIN | NPPO | REVIEW | Approved | |
| 10/14/2008 | CRAIG GROSS | ZONING | REVIEW | Approved | |
| 10/21/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Denied | DATE: October 21, 2008 SUBJECT: Site Plan TO: NJB Consulting (Norma) LOCATION: 5255 E Canada St, T15S, R14E, Section 2, Ward 4 REVIEWERS: Bianca Ramirez, CFM ACTIVITY: T07CM02857 (Third Review) RESUBMITTAL REQUIRED: Site Plan SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed site plan for the above referenced property. Engineering Division does not recommend approval of the site plan at this time. Please address the following review comments prior to the next submittal. Please include a response letter to the comments along with the corrected copies of the site plan. Site Plan: 1. Show sight visibility triangles for the parking areas and for the main entry into the site. Since Canada Street is not paved, indicate the edge of the usual travel lane as the base of the SVT. If the parking arrangement that is shown on the plan is approved through the variance process, show how the customer service trailer will not block the vision of drivers backing into the street. Label near and far side SVT's correctly, they appear to be backwards. Show how the customer service trailer will not block the vision of drivers backing into the street. 2. Explain by note or in a response letter how solid waste will be removed from the property. If roll cans are used, show their storage location on the plan. Label location of roll out cans on site plan. 3. Explain if additional paving is required or proposed for this site. Keep in mind if there is, then a revised drainage statement or drainage report will be required. Clearly indicate what type of material is going to be used to construct fire lane. 4. Complied 5. Additional comments may be forthcoming. If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov Bianca C. Ramirez Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 837-4928 office (520) 879-8010 fax |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/23/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 10/23/2008 | SUE REEVES | REJECT SHELF | Completed |