Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM02804
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/24/2007 | CHRIS KIEL (WILDAN) | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Please provide sheet A2 as referenced throughout the plans per section 106.1.1 of the 2003 IBC in order to verify compliance with chapters 10, 11, and 12 of the 2003 IBC and ANSI 117.1-2003. COMMENT REMAINS: Please provide the dimensional placement for the rear and side wall grab bars in order to verify compliance with sections 604.5.1 and 604.5.2 of ANSI 117.1-2003. Please revise the height of the wet bar sink in accordance with section 1109.3 of the 2006 IBC and section 606.3 of ANSI 117.1-2003. Please revise the size of the font within the door and room finish schedules to be a minimum of 1/8" in accordance with the submittal requirements for the City of Tucson. Please specify the size of the water closet grab bars in order to verify compliance with section 609 of ANSI 117.1-2003. Please coordinate the detail referenced within keynotes 10.11 and 10.12 as they reference the window schedule instead of the typical fixture heights. COMMENT REMAINS: Please revise the font size for the new detail 14/A2 in accordance with the submittal requirements of the City of Tucson and specify the size of the water closet grab bars in accordance section 609 of ANSI 117.1-2003. |
| 07/24/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 07/24/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide sufficient information to show that the proposed roof access complies with the requirements of Section 306.5, IMC 2003. |
| 08/01/2007 | GBONILL1 | ENGINEERING | REVIEW | Needs Review | |
| 08/01/2007 | GBONILL1 | ZONING | REVIEW | Needs Review | |
| 08/01/2007 | GBONILL1 | WWM | REVIEW | Needs Review | |
| 08/01/2007 | GBONILL1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 08/01/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |