Permit Number: T07CM02757
Parcel: 136048320

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T07CM02757
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/06/2008 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. REFERENCES TO 2006 IRC STILL SPRINKLERED THROUGH OUT DOCUMENTS; A6.0, PARAGRAPH 4
2. NOTE 6 ON SHEET S-2 NOT REVISED TO PLY WOOD
3. PROVIDE STERUCTURAL CALCULATIONS AND DETAILS FOR ADDED SOLAR WATER HEATER.
03/17/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Section 304.10, IMC 2006 requires the guard to have a minimum height of 4'-6" above the elevated surface by the guard.
2. Comment not resolved. Provide structural calculations to show how the solar water heater will be installed and that the installation will not adversely affect the building structure. Reference: Sections 302.1 and 1402.4.1, IMC 2006.
03/17/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide upper terminal cleanouts for P-2, P-3, and P-10. Reference: Section 707.4, UPC 2006.
2. Provide the rating (BTUH) of the temperature relief valve for water heater WH1. Reference: Section 608.5, UPC 2006 and Section 1402.5.1, IMC 2006.
3. Locate the expansion tank for WH1 per the manufacturer's listing (on the cold water inlet to the solar panel, with no shut off valves between the panel and the expansion tank). Reference: Section 608.3, UPC 2006 and Section 1402.5.4, IMC 2006.
03/24/2008 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov
IF YOU CARE TO DISCUSS.

1. Tankless Water Heater Schedule calls for a 120V WH. Electrical provides 240V power. Please clarify. THIS COMMENT WAS MADE ON THE FIRST SUBMITTAL AND SECOND SUBMITTALS. Three phase equipment as now specified can not be powered from a single phase source.
2. Provide a disconnecting means for this Water Heater. Reference NEC 422 Part III.
3. Revised Electrical Calculation still do not reflect the true sum, which is 27,609 VA, not 17,609. Please correct amperage draw as well. COMMENT MADE PREVIOUSLY. If Water Heater, as specified, draws 100A, then at 240V 3-phase it will consume 41,569W, not 3600. Please note that one Heat Pump is to draw 15A and the other only 1A according to the HVAC Schedule Sheet M2.0. At 15A the power consumed would be 3600W, not 3250.
4. Outdoor Lighting Calculations account for a 60W fixture. Luminaire Schedule and cut sheet call for a 120W fixture. Please clarify, and correct the Calculations as necessary. COMMENT MADE PREVOUSLY. The compact fluorescent fixture now specified should put out more than 900 mean lumens per fixture. Provide manufacturer documentation of such.
04/03/2008 HEATHER THRALL ZONING REVIEW Denied Zoning cannot approve the building plans until building code structural review approves them.

I acknowledge the 9' setback and the 8'10 tall wall will meet setbacks at the west side for the residential portion of the building.

These plans can be walked thru at the counter once building code reviews and approves the building plans. thanks - HT
04/11/2008 BIANCA RAMIREZ ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
04/24/2008 DELMA ROBEY OUT TO CUSTOMER Completed
04/24/2008 SHANAE POWELL REJECT SHELF Completed