Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T07CM02757
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/27/2007 | DAVE MANN | FIRE | REVIEW | Approved | |
| 08/30/2007 | HEATHER THRALL | ZONING | REVIEW | Denied | Zoning will continue the review of the building plans once the site plan has been approved. The review of the building plans can be done at the site plan resubmittal or over the counter. |
| 09/06/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide updated energy code compliance calculations. Reference Section 101.4, International Energy Conservation Code 2006. 2. The 2006 International Mechanical Code with local amendments is the relevant code for the mechanical portion of this project. 3. Provide manufacturer's listing and technical information for the heat pumps to be used on this project. |
| 09/06/2007 | ROBERT SHERRY | WATER | REVIEW | Denied | Reduced pressure backflow prevention assemblies are required at the water meter for multi-use commercial buildings. Reference COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
| 09/07/2007 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | 1) This project must be designed using the 2006 International Building Code. Please provide correct code analysis. ppA1.0 2) Provide structural calculations for all forces acting on the building. IRC prescriptive design does not apply to commercial buildings. 3) Remove references to IRC design methods from the plans. 4) If 3kpsi concrete is required for footings (keynote 3 pp S1) then justify design and provide special inspection program. 5) Deferred submittals must be approved by the building official. ppS2 6) Calculations required to justify beam size B1. ppS2 7) Provide details for framing connections. Keynotes referencing the code are insuffcient. ppS2 8) PP A2.0 has Ref. plan key notes and section cuts (W1, W2, W3) that have no corresponding details. 9) Provide approved penetration firestop system information along with firewall assembly details. 10) The water cistern appears to exceed the 2:1 height/width requirements for exception to IBC section 105. Please provide structural calculations. pp A5.0 11) PP S1 gives a cut reference to 2/A5.0; Remove all framing, clip and sheet rock references on this footing detail or make this detail correspond with other references to 2 hr construction. 12) Justify and detail or properly keynote any shearwalls. ref detail 8/A5.0 13) Justify size and location of roof scuppers. Provide complete information on how roof drains are diverted to the water cistern. pp A3.0 14) Because this building appears to have been designed using a combination of the IRC and the IBC this may not be a complete set of corrections. Othere situations may arise during the correction phase of the design. |
| 09/07/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for this project is the 2006 Uniform Plumbing Code with local amendments. 2. Provide the minimum plumbing facilities (i.e. a drinking fountain) required by Table 2902.1, IBC 2006, for business occupancy. 3. Provide water supply and waste and vent isometrics. Reference Section 103.2.3, UPC 2006. 4. Provide fixture descriptions or material standards for all plumbing fixtures. Reference Section 401.1, UPC 2006. 5. Show how the temperature of the hot water supply to the public lavatory is controlled. Reference Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 6. Specify shower and tub/shower control valves that comply with the requirements of Section 418.0, UPC 2006. 7. Specify the faucets to be installed for the public lavatory. The maximum flow rates for plumbing fixtures shall be consistent with ARS Title 45, Chapter 1, Article 12. See text at: (http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp). Reference Section 402.1, UPC 2006, as amended by the City of Tucson. 8. Show that the proposed water heater is being applied per the manufacturer's recommendations with respect to capacity. Reference Section 501.0, UPC 2006. 9. Coordinate the size of the water service piping to the building as shown on the drawings (1" on the site plan, ¾" on M1.0). 10. The water pressure to the project location is in excess of 80 PSI. Show the location of the pressure reducing valve on the drawing. 11. Provide sizing and installation information for the primary and overflow roof scuppers. Reference Section 1101.11, UPC 2006. |
| 09/14/2007 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; East District; 526 Square Feet of Office ($1242.41); 674 Square Feet of Residental Use ($1887.00); $3,179.41 Total Fee's |
| 09/18/2007 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 09/19/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Provide cut sheets for HP-1 and HP-2, and provide all power requirements on Sheet M1.0. 2. Provide and electrical circuit for the interior HP units. 3. Notation by HP disconnect indicates #12 conductor. Panel schedule calls for #6. Please clarify. 4. Tankless Water Heater Schedule calls for a 120V WH. Electrical provides 240V power. Please clarify. 5. Remove references to IRC, and design per NEC 2005. 6. Provide at least one more Small Appliance Branch Circuit. Reference NEC 210.11 (C) (1), NEC 210.52 (B) (3). 7. Dwelling unit receptacle spacing per NEC 210.52 (A). 8. Provide a maintenance receptacle for the Heat Pump. Reference NEC 210.63. 9. Provide another outdoor outlet for the dwelling unit. Reference NEC 210.52 (E). 10. Provide a hallway out for the dwelling unit. Reference NEC 210.52 (H). 11. Provide a switch for the lighting outlet in the storage room. Reference NEC 210.70 (A) (3). 12. Lighting fixture in storage room shall not be on Ckt A-19. Reference NEC 210.11 (C) (2). 13. Provide an electrical circuit for the range referenced in Electrical Note #11. 14. Add this range to the Electrical Calculation. 15. Total of 296,160W for Electrical Calculation is not the true sum. 16. The calculation per NEC 220.82 is applicable to the residential. Add the office electrical loads according to the other sections of Article 220. 17. Show TEP transformer location. Only if cable length is over 45' is 10,000A Available Fault Current valid. 18. Provide a lighting fixture schedule. 19. Please provide cut sheets for exterior lighting. 20. It appears that this location is in Lighting Code Area E3, not E3a, which would help if the Owner wanted more lighting in the future. 21. Demonstrate compliance with the 2006 IECC for the Interior Lighting Power Allowance in the Offices, and for Exterior Building Grounds Lighting source efficacy. |
| 09/24/2007 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | An approved site plan is required prior to building plan approval. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/16/2007 | VFLORES1 | OUT TO CUSTOMER | Completed |
| 11/16/2007 | VFLORES1 | REJECT SHELF | Completed |