Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM02711
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/26/2007 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 06/26/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide balancing data for the restroom exhaust (i.e. how many cfm for the men's, how many cfm for the women's). |
| 06/26/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Complete the water pressure calculations shown on sheet P1.0. Reference Section 103.2.3, UPC 2003. 2. Complete the waste and vent isometrics. Reference Section 103.2.3, UPC 2003. 3. Show that the floor of the restroom slopes toward the floor drain. Reference Section 412.2, UPC 2003. 4. "Waterless" urinals are not Code-compliant fixtures. Reference Sections 211.0, 406.2, 406.3, 601.1, and 1005.0, UPC 2003. 5. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003. 6. Provide an upper terminal cleanout for the floor sink located in the lobby. Reference Section 707.4, UPC 2003. |
| 06/26/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 06/26/2007 | CHRIS KIEL (WILDAN) | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Please coordinate all toilet room dimensions with the accessiblity details on sheet A2.0 and in accordance with section 604 of ANSI 117.1-2003. 2) Please revise the connection details for the new monitors per section 1604.1 of the 2003 IBC. 3) Please revise doors 2 & 3 to comply with section 1008.1.8.3 of the 2003 IBC as only the main door is permitted to have keyed cylinders and the applicable signage. 4) Please provide stuctural calculations and appropriate plans, sections and details to provide sufficient information regarding the addition on the southeast side per section 106.1.1 of the 2003 IBC. 5) Please specify the vertical placement of the vertical grab bar in accordance with section 604.5.1 of ANSI 117.1-2003. 6) Please revise the self-serve drink station to eliminate the horizontal projection per section 1003.3.3 of the 2003 IBC. |
| 07/05/2007 | DROBEY1 | WWM | REVIEW | Needs Review | |
| 07/05/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | T07CM02711 6/26/07 1. Provide an electrical circuit for the new Exhaust Fan. |
| 07/05/2007 | DROBEY1 | ENGINEERING | REVIEW | Needs Review | |
| 07/05/2007 | DROBEY1 | ZONING | REVIEW | Needs Review | |
| 07/05/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/05/2007 | DELMA ROBEY | APPROVAL SHELF | Completed |
| 07/05/2007 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 07/05/2007 | DELMA ROBEY | REJECT SHELF | Completed |