Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T07CM02691
Parcel: 105102480

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T07CM02691
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/19/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
07/26/2007 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
07/26/2007 CHRIS KIEL (WILDAN) BUILDING-COMMERCIAL REVIEW Needs Review 1) Please provide verification regarding compliance with table 307.7(2) regarding the volume of corrosives. COMMENT REMAINS: The comment response letter references a letter from the owner that was not supplied. Please provide accordingly.

2) Please provide an accessible public restroom in accordance with table 2902.1 of the 2003 IBC. The current submittal indicates that the public would have to go behind the sales counter and through a storage area to access the toilet facilities. COMMENT REMAINS: The City of Tucson's policy for public restrooms is that the public should not have to travel through storage to access the restroom facilities. Please revise accordingly.

3) Please provide additional information regarding the sales counters in order to verify compliance with section 904 of ANSI 117.1-2003. COMMENT REMAINS: Please provide the information regarding the acessible counter on the plans in accordance with section 106.1.1 of the 2003 IBC.

4) Please provide additional information for the storage racks in the storage area per section 106.1.1 of the 2003 IBC. COMMENT REMAINS: Please provide the information regarding the storage racks on the plans per section 106.1.1 of the 2003 IBC.

5) Please provide a drinking fountain in accordance with table 2902.1 of the 2003 IBC. COMMENT REMAINS: Section 410.1 of the 2003 IPC (referenced in table 2902.1 of the 2003 IBC) specifies that not more than 50% of the required drinking fountains can be replaced with bottled water coolers. Either provide the required drinking fountain (and the associated accessible details) or provide an appeal from the Building Official to allow the bottled water cooler.
07/26/2007 VFLORES1 WWM REVIEW Needs Review
07/26/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Needs Review Substitution of bottled water for a drinking fountain will require an appeal to the Building Official.