Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM02691
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/25/2007 | DAVE MANN | FIRE | REVIEW | Approved | |
| 06/25/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide information to show that the proposed use of the space will not require ventilation per Section 502.5, IMC 2003. |
| 06/25/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Connect the eyewash (P3) to the sanitary drainage system. 2. Show how the water heater support is connected to the existing structure. 3. Provide a drinking fountain. |
| 06/25/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 06/25/2007 | CHRIS KIEL (WILDAN) | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Please provide a code analysis for this tenant space per section 106.1.1 of the 2003 IBC. 2) Please provide verification regarding compliance with table 307.7(2) regarding the volume of corrosives. 3) Please provide an accessible public restroom in accordance with table 2902.1 of the 2003 IBC. The current submittal indicates that the public would have to go behind the sales counter and through a storage area to access the toilet facilities. 4) Please provide additional information regarding the sales counters in order to verify compliance with section 904 of ANSI 117.1-2003. 5) Please provide additional information for the storage racks in the storage area per section 106.1.1 of the 2003 IBC. 6) Please revise door note #3 to reference the currently adopted accessibility code (ANSI 117.1-2003). 7) Please provide the required door signage at the main entry per section 1008.1.8.3 of the 2003 IBC. 8) Please provide a drinking fountain in accordance with table 2902.1 of the 2003 IBC. |
| 06/26/2007 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 06/26/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T07CM02691 6/26/07 1. The circuit breaker protecting the Water Heater should be 25A, not 30A per NEC 422.11 (E) (3). 2. Please count 200 VA/LF for the show window receptacles per NEC 220.12 (A). 3. Note that our font size is 1/8" minimum. Please blow lettering up as much as practible for this project, and keep in in mind for future work. 4. Provide a circuit for Fixtures B1 in the Retail area. |
| 06/26/2007 | HEATHER THRALL | ZONING | REVIEW | Approved | |
| 07/19/2007 | CAGUILA1 | WWM | REVIEW | Needs Review | |
| 07/19/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |