Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T07CM02550
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/15/2007 | GERRY KOZIOL | WWM | REVIEW | Denied | NEEDS TO SHOW LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER NEEDS WW 8TH FLOOR DEMO CREDIT IF APPLICABLE |
08/15/2007 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The building plans cannot be approved until the Development Plan has been approved and stamped as a site plan. |
08/16/2007 | MARTIN BROWN | FIRE | REVIEW | Denied | On page F351 Fire protection remove backflow preventer from fire sprinkler system Add address numbers to plans |
08/20/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/21/2007 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: T07CM02550 Building Plan (1st Review) TRANSMITTAL DATE: August 21, 2007 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. The development plan will need to be reviewed as a site plan (yellow card). This review can be done over the counter as a walk through. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. C:\planning\grading\t07cm02550.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
08/30/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | Caroline will be bringing in Demoliltion Square Footage for Impact Fee Credits. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/05/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
05/05/2008 | DELMA ROBEY | REJECT SHELF | Completed |