Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T07CM02522
Parcel: 135074540

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T07CM02522
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/19/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Cannot review without the approved shell drawings for reference.
06/19/2007 RSHERRY1 WWM REVIEW Denied Cannot review without the approved shell drawings for reference.
06/19/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Cannot review without the approved shell drawings for reference.
06/19/2007 MARTIN BROWN FIRE REVIEW Approved
06/19/2007 ROBERT SHERRY WATER REVIEW Denied Cannot review without the approved shell drawings for reference.
07/06/2007 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Approved
07/18/2007 CHRIS KIEL (WILDAN) BUILDING-COMMERCIAL REVIEW Denied 1) Please revise the font size to a minimum of 1/8" and all capital letters in accordance with the submittal requirements for the City of Tucson per section 106.1.1 of the 2003 IBC.

2) Please provide verification that the interior walls can resist a 5#/sf horizontal load in accordance with section 1607.13 of the 2003 IBC.

3) Please provide additional information regarding the lavatories, water closets, grab bars and toilet paper dispensers in order to verify compliance with the requirements of chapter 6 of ANSI 117.1-2003.

4) Please provide a hard, nonabsorbent surface on the walls surrounding the water closet in accordance with section 1210.2 of the 2003 IBC.

5) Please provide structural verification that the existing structural components can support the new mechanical units in accordance with section 106.1.1 of the 2003 IBC. While the reference shell plans indicate a blocked out area for the evaporative coolers, it doesn't appear to address the loads for the coolers nor the air conditioning unit.

6) Please ensure that two accessible means of egress have been provided from the building in accordance with section 1007.1 of the 2003 IBC. The shell plans appear to indicate a site wall around the rear exit preventing egress to the public way.

7) Please provide a larger floor plan of the restroom facilities in order to verify compliance with section 1109.2 of the 2003 IBC and chapter 4 and 6 of ANSI 117.1-2003.

8) Please provide additional information regarding door hardware set #1 in order to verify compliance with section 1008.1.8 of the 2003 IBC. The current submittal appears to indicate that two operations may be required to open the door. Please revise accordingly.

9) Please provide emergency power for the egress illumination in accordance with section 1006.3 of the 2003 IBC. Please ensure that emergency power is provided for the lights at the egress discharge side of the exit doors. The current submittal of the reflective ceiling plans indicate emergency lights, but the electrical lighting plans do not. Please coordinate accordingly.

10) Please specify the area associated with the different uses listed within the code analysis per section 106.1.1 and calculate the occupant load per table 1004.1.2 of the 2003 IBC. Graphically represent these areas on the floor plan per section 106.1.1 of the 2003 IBC.

11) Please provide an addditional exit sign for the second exit from the storage/factory area per section 1011.1 of the 2003 IBC.

12) Please provide additional information regarding the materials to be stored/or materials to be fabricated in order to verify compliance with chapters 3 and 4 of the 2003 IBC.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/18/2007 DELMA ROBEY OUT TO CUSTOMER Completed
07/18/2007 DELMA ROBEY REJECT SHELF Completed