Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/09/2007 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/11/2007 | MARTIN BROWN | FIRE | REVIEW | Approved | |
07/12/2007 | Michael Wyneken | ZONING-CITY HALL | REVIEW | Denied | 1) Enlarged dimentional plan dimentions do not match dimentions in antenna detail. Max. stand-off per SE conditions is one foot six inches. 2) Add note stating the new facilities will be painted the same color as existing. 3) Add note: wire ports shall be no higher or lower than the antenna panels. Cables shall be routed through the interior of the pole, and shall not be visible. |
07/13/2007 | TERRY STEVENS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Terry Stevens Lead Planner PROJECT: T07CM02513 7555 S. Houghton Rd. Add Antennas to Existing Tower TRANSMITTAL: 07/13/07 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Revise the project address indicated on all plans to the correct address. 2. The indicated adjacent zoning to the east of the proposed site, (Zoning: P), is incorrect. The correct zoning is R-1. Revise. 3. The Cell Tower site plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Special Exception section of DSD. 4. A copy of the Special Exception approval letter must accompany the plan. Additional comments may be forth coming based on approval conditions. 5. Provide a copy of the last approved site plan for the self-storage site. 6. On the site plan clearly indicate the location of the required technician parking space. 7. It appears the electrical service is being located on a different parcel than the cell tower site. An electrical easement will be required from the panels to the parcel 8. An access easement is required to be provided to the two parcels from Valencia. Parcels cannot be land locked. Provide recording docket and page information on the site plan for the access easement to the cell tower parcels. Clearly indicate the limits of the access easement. If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961 |
07/25/2007 | JAY HOGAN | OPERATIONS | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/28/2007 | VFLORES1 | OUT TO CUSTOMER | Completed |