Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM02443
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/13/2007 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 07/16/2007 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 07/31/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Please demonstrate that additional 288A does not overload existing service. That is not clear on the plans. In so doing, please consider 25% for the largest motor and loading on Panel AC: (2) (25.1) + (2) (3.1) = 56.4A (360) = 20,304VA, or 6.8KVA per phase, not 6.5. 2. Mechanical specifies 80A maximum fuse size for the CC HP units. See notes under Compressor-Condenser Schedule Sheet MO.1. No such fuse specified on Electrical plans, just the breakers at the panel. 3. Keynotes 7 and 8 were used twice each on the One-Line Diagram. Please verify application. 4. There is a notation on the One-Line Diagram pertaining to the feeder between the wireway and a 200A disconnect. It calls for (2) #6 to the panel, but from where? It calls for (2) 3/0 to a tap inside a gutter, but from where? |
| 08/01/2007 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 08/08/2007 | GERRY KOZIOL | WWM | REVIEW | Passed | |
| 08/10/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide the rise and total length of the common vent for the two furnaces and the relocated water heater. Provide calculations to show how the common vent has been sized. Reference Section 504, IFGC 2006. 2. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, and valves. Reference Sections 103.2.3, 605.5, 608.3, and 608.5 UPC 2006. 3. Specify the methods and materials to be used to provide fire stopping for penetrations of fire-rated assemblies. Reference Section 1502.1, UPC 2006. |
| 08/10/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/10/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the ventilation calculations (ASHRAE 62.1) to comply with the requirements of Section 403.3, IMC 2006, as amended by the City of Tucson: the occupant density used for calculations must be at least equal to the default occupant density (Table 6-1). 2. The refrigerant quantities for AHU-1 and AHU-2 (20.9 pounds R-22 per circuit) appear to be greater than indicated by Table 1103.1 for use without a machinery room. Revise the design of the east and west equipment rooms per Section 1105, IMC 2006. |
| 08/15/2007 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | DATE: August 15, 2007 ACTIVITY NUMBER: T07CM02443 PROJECT NAME: Install Mechanical Equipment PROJECT ADDRESS: 2331 East Adams Street PROJECT REVIEWER: Patricia Gilbert RESUBMITTAL REQUIRED: SITE PLAN, FLOODPLAIN USE PERMIT APPLICATION SUBMITTAL REQUIRED: COST ESTIMATE FROM A LICENCED CONTRACTOR 1. Improvements to an Existing Nonconforming structure in a City of Tucson Regulatory Flood Hazard Area can not exceed 50% of the value of the structure (the full cash value of the structure as shown on the latest assessment rolls of the county assessor). The contractor's estimate (labor and materials) of the improvement to the structure was not submitted. Submit a contractor's estimate for the proposed work with a floodplain use permit application. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/31/2007 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 08/31/2007 | CINDY AGUILAR | REJECT SHELF | Completed |