Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T07CM02431
Parcel: 128010190

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T07CM02431
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/12/2007 DAVE MANN FIRE REVIEW Approved
06/12/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the font size to 1/8" minimum, all uppercase.
2. Show that the roof is capable of supporting the new rooftop units.
3. Provide calculations demonstrating adequate ventilation. Reference Section 401.2, IMC 2003.
4. Recirculation of ventilation air from toilet rooms is prohibited. Reference Section 403.2.1 (3), IMC 2003.
5. Show the size, route, and termination of the condensate drains from the rooftop units.
6. Show how the new air conditioning system complies with Section 606.0, IMC 2003.
7.Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference Section 803.2.8, IECC 2003.
06/12/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 302.3, Uniform Administrative Code, 1997.
2. Provide plumbing plans for the new work, in addition to the water isometrics and waste and vent isometrics. Reference Section 103.2.3, UPC 2003.
3. Coordinate the water heater detail with the riser diagram. The T&P relief may not terminate into the drip pan. Reference Sections 103.2.3 and 508.5, UPC 2003.
4. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference Sections 310.0 and 314.5, UPC 2003.
5. The maximum flow rates for plumbing fixtures shall be consistent with ARS Title 45, Chapter 1, Article 12. See text at: (http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp). Reference Section 402.1, UPC 2003, as amended by the State of Arizona.
6. Show that the restroom floors slope toward the floor drains. Reference Section 412.2, UPC 2003.
7. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003.
8. Provide protection of the trap seals for all floor drains subject to infrequent use. Reference Sections 1007.0 and 1007.1, UPC 2003, as amended by the City of Tucson.
9. Specify the backflow preventer shown in the water riser diagram. Show the location of the device. Reference Sections 103.2.3 and 603.3.4, UPC 2003.
06/12/2007 ROBERT SHERRY WATER REVIEW Approved
06/12/2007 CHRIS KIEL (WILDAN) BUILDING-COMMERCIAL REVIEW Needs Review
06/13/2007 CAGUILA1 WWM REVIEW Needs Review
06/13/2007 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Needs Review
06/13/2007 ANY ENGINEERING REVIEW Approved
06/13/2007 STEVE SHIELDS ZONING REVIEW Approved
06/13/2007 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed