Permit Review Detail
Review Status: Active
Review Details: COMMERCIAL TI
Permit Number - T07CM02426
Review Name: COMMERCIAL TI
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/12/2007 | ANY | ZONING | REVIEW | Active | |
| 06/12/2007 | ANY | ENGINEERING | REVIEW | Active | |
| 06/12/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T07CM02426 6/12/07 1. RTU-1 is existing according to the Mechanical Equipment Data, Electrical Panel Schedule and Mechanical Plan, but new on the Single Line Diagram. Please clarify. 2. Provide electrical requirements for RTU-2, and any other new equipment. 3. Provide feeder size for RTU-2. 4. RTU-2 goes on Panel P according to the panel schedule. Show Panel P on the Line Diagram. 5. 24094/120 = 201 A. Phase A of Panel P appears to be overloaded. |
| 06/12/2007 | ANY | FIRE | REVIEW | Active | |
| 06/12/2007 | CHRIS KIEL (WILDAN) | BUILDING-COMMERCIAL | REVIEW | Denied | 1) PLEASE PROVIDE VERIFICATION THAT THE EXISTING STRUCTURAL COMPONENTS CAN SUPPORT THE NEW MECHANICAL EQUIPMENT PER SECTION 106.1.1 OF THE 2003 IBC. PLEASE ALSO SPECIFY THE WEIGHT OF THE UNIT ON THE PLANS. |
| 06/12/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the font size to 1/8" minimum, all uppercase. 2. Show how RTU-2 is to be controlled. 3. Show that the roof structure is capable of supporting the new rooftop unit. Provide the installed weight of the new rooftop unit. 4. Clarify how the space is ventilated. 5. Show the size, route, and termination of the condensate drain for RTU-2. |