Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T07CM02311
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/29/2007 | DAVE WITT | BUILDING-RESIDENTIAL | REVIEW | Denied | PLAN CHECK COMMENTS - PROJECT #T07CM02311 8/31/07 5719 E. 24th Street PLAN REVIEW FOR THE ABOVE REFERENCED STRUCTURE HAS BEEN COMPLETED. THIS LETTER REFLECTS COMMENTS TO BE ADDRESSED. IN ORDER TO FACILITATE A SHORTER BACK CHECK TIME, WE REQUEST THAT YOU PLEASE PROVIDE REVISED PLANS AND CALCULATIONS, HIGHLIGHTING ANY CHANGES, ALONG WITH A WRITTEN RESPONSE TO EACH OF THE NOTED ITEMS INDICATING ACTION TAKEN. SCOPE OF REVIEW: THE SCOPE OF THIS PLAN REVIEW COVERS ARCHITECTURAL, PLUMBING, MECHANICAL, MODEL ENERGY AND ELECTRICAL CODES. ALL CODE REFERENCES ARE TO THE 2006 IRC AND STATE PLUMBING CODE. ALL FEATURES WERE CHECKED ONLY TO THE EXTENT ALLOWED BY THE SUBMITTALS PROVIDED. ALL PORTIONS OF THIS PROJECT ARE ASSUMED TO MEET OR WILL MEET OTHER DEPARTMENTAL REQUIREMENTS, CONDITIONS AND CONCERNS BEFORE PERMIT APPROVAL. GENERAL REQUIREMENTS: 1. ALL PLANS SHALL BE LEGIBLE AND A SCALE NO SMALLER THAN ¼ INCH = 1-FOOT SHALL BE USED FOR ALL FLOOR PLANS, FRAMING PLANS AND ELEVATIONS. DETAILS &CROSS SECTIONS AT A MINIMUM 3/8 INCH = 1-FOOT SCALE. 2. ALL CORRECTIONS AND REVISIONS SHALL BE MADE ON THE ORIGINAL TRACINGS AND TWO NEW SETS OF PRINTS OR (1) SEPIA & (1) BLUE LINE SHALL BE RETURNED ALONG WITH ALL REDLINE PRINTS. 3. PEN OR PENCIL CORRECTIONS ON FINAL PRINTS WILL NOT BE ACCEPTABLE. TO AVOID DELAYS ENSURE ALL CORRECTIONS HAVE BEEN MADE, ARE COMPLETE AND HAVE BEEN COORDINATED ON ALL APPLICABLE DETAILS AND NOTES. 4. ALL ENGINEERS AND ARCHITECTS INVOLVED IN THE DESIGN OF THE STRUCTURE ARE TO SEAL THE RELATED SHEETS OF PLANS, DETAILS AND CALCULATIONS. THIS IS IN ACCORDANCE WITH THE RULES OF THE STATE BOARD OF TECHNICAL REGISTRATION. SITE PLAN: 1. PLEASE INDICATE THE LOCATION OF THE SEWER LINE ON THE PROPERTY. FOUNDATION PLANS: 1. PROVIDE 4 / A-1 . 2. SHOULD 1 / A-1 BE POINTING AT ANOTHER PLACE ON THE FOOTING ? 3. PROVIDE THE SIZE OF THE PORCH POST FOOTINGS. STRUCTURAL PLANS: 1. SPECIFY DESIGN CRITERIA ON PLANS. VALUES FOR ROOF DEAD LOAD AND LIVE LOAD. 2. PROVIDE A DETAIL FOR THE PORCH LEDGER CONNECTION. 3. ROOF FRAMING ; THE NOTE SAYS "LUS 210 HANGERS @ EACH RAFTER / BEAM". SHOULD IT SAY EACH RAFTER / LEDGER ? 4. SHEAR WALL TYPE "B" ; 2-16d PER HPAHD 22 ARE INSUFFICIENT PER SIMPSON. SIMPSON SPECIFIES 23-16d . 5. SHEAR WALL TYPE "A" : SCREWS AREN'T AS MALLEABLE AS NAILS. MORE BRITTLE. JUSTIFY SCREWS INSTEAD OF NAILS IN THE SHEATHING. SECTIONS - DETAILS - MISC. NOTES: 1. 1 / A-2 ; PLEASE JUSTIFY THE "4 DIA BAR LAP". Typo ? 2. 1 / A-2 ; SHOULD THIS DETAIL APPLY TO A FOOTING INSTEAD OF A BOND BEAM ? 3. 5 / A-2 ; HOW DEEP AND HOW THICK IS THE FOOTING ? 4. 1, 2 / A-3 ; PLEASE PROVIDE A COPY OF ICBO 3899. IS THIS THE CORRECT NUMBER? 5. 1, 2 / A-3 ; SPECIFY THE GAGE OF THE LATH. 6. 1, 2 / A-3 ; THE SPACING OF THE NAILS / STAPLES CONFLICTS WITH R703.6.1 . 7. 1, 2 / ; WHAT IS "P.I. 31/16" ? 8. 5 / A-3 ; PLEASE SHOW WHAT THE "16d @ 12" O.C. VERT….." APPLIES TO. 9. 4 / A-3 ; PROVIDE A CONNECTION BETWEEN THE SOLE PLATE AND THE CONCRETE. PLUMBING PLANS: 1. NOTE AND SPECIFY ALL PIPING MATERIALS. 2. PLEASE SIZE THE SUPPLIES TO THE WATER HEATER. 3. PLEASE NOTE AND SIZE THE COMBUSTION AIR TO THE EXISTING WATER HEATER IF IT'S GAS. 4. THE PLUMBING PLAN'S 3" VTR FOR THE WATER CLOSET CONFLICTS WITH THE ISOMETRICS 2" VTR FOR THE WATER CLOSET. PLEASE CONSOLIDATE. 5. GENERAL PLUMBING NOTES ; PLEASE CHANGE THE REFERENCE TO THE '94 UPC TO THE 2006 UPC. 6. PLEASE COMPLETE THE PLUMBING NOTE BELOW THE ISOMETRIC. MECHANICAL PLANS: 1. EF-1 AND EF-2 ARE THE SAME MODEL FANS. WHY DO THEY HAVE DIFFERENT VOLUMETRIC CAPACITIES (CFM) ? ELECTRICAL PLANS: 1. WIRING NOTE ; WIRING BELOW 6'…. SHOULD SAY WIRING BELOW 8' REQUIRES PROTECTION / CONDUIT. 2. PROVIDE A PANEL SCHEDULE. 3. PLEASE PROVIDE A NOTE THAT THE EXISTING HOUSE IS REQUIRED TO BE PROVIDED WITH SMOKE DETECTORS. SEE R313.2.1 . ENERGY CODE: 1. JUSTIFY THE INSULATION AND U-VALUES. OUTDOOR LIGHTING: 1. JUSTIFY THE LUMENS FOR THIS LOT. IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT YOUR ASSIGNED PLANS EXAMINER: DAVE WITT @ 837-4910 |
| 09/04/2007 | GERRY KOZIOL | WWM | REVIEW | Denied | NEEDS WASTEWATER 8TH FLOOR CREDIT EVALUATION |