Permit Number: T07CM02253
Parcel: Unknown

Address:
3202 N ORACLE RD

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T07CM02253
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/01/2007 CHRIS KIEL (WILDAN) BUILDING-COMMERCIAL REVIEW Denied 1) PLEASE VERIFY THE ANTICIPATED USE FOR THE PROFORMANCE AREA IN ORDER TO VERIFY COMPLIANCE WITH CHAPTER 3 AND 5 REGARDING THE TYPE OF USE (A-1 VS. B) AND THE UNLIMITED BUILDING AREA.

2) PLEASE PROVIDE AN APPROVED MEANS OF EGRESS FROM THE STAGE PER SECTION 410.5.4 OF THE 2003 IBC (I.E. STAIRS AND HANDRAIL, ETC.).

3) PLEASE REVISE THE OCCUPANT LOAD FOR THE PERFORMANCE AREA AND PROVIDE A SECOND EXIT PER CHAPTER 10 OF THE 2003 IBC.

4) PLEASE PROVIDE STRUCTURAL CALCULATIONS FOR THE NEW OPENINGS IN EXISTING BEARING WALLS PER SECTION 106.1.1 OF THE 2003 IBC. PLEASE VERIFY IF THE INTERIOR WALL TO BE OPENED IS A BEARING WALL OR NOT.

5) PLEASE VERIFY THAT THE INCREASE IN THE OCCUPANT LOAD DOESN'T REQUIRE ADDITIONAL TOILET FACILITIES IN ACCORDANCE WITH CHAPTER 29 OF THE 2003 IBC.

6) PLEASE PROVIDE STRUCTURAL VERIFICATION THAT THE EXISTING ROOF STRUCTURE CAN SUPPORT THE ADDITIONAL LOADS FOR THE NEW A/C UNITS PER SECTION 106.1.1 OF THE 2003 IBC.
06/01/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Clarify the relationship between the mechanical plan and the ventilation calculations. Where is AC-1 located? Why is Recording 8 ventilation included with AC-2 when it is served by AC-3?
06/01/2007 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T07CM02253 6/1/07

It appears that phases A and C of Panel Z are overloaded. Beginning with Panel D Ckts 2 and 3 appear to have 1080 VA, not 900, but this would depend on which circuits are intended for the unmarked receptacles on the Power Plan. And Ckt 10 on Panel D powers "Stage" but there is no electrical load on the panel schedule.
Panel Z Phase A Continuous Loading at 125% appears to be 12013VA, not 9201; Non-continuous load appears to be 36530VA, not 32245; so total VA would be 56268, or 203 Amps at 277V.
Phase B Non-continuous appears to be 36110VA, not 31685, for a total of 53716 VA, or 194A, which leaves little leeway for re-configuration.
Phase C Non-continuous appears to be 35750VA, not 31465, for a total of 55742 VA, or 201A.
06/01/2007 ROBERT SHERRY WATER REVIEW Approved
06/01/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Show how the plumbing plan relates to the building located at 3202 North Oracle Road.
06/28/2007 GBONILL1 WWM REVIEW Denied
06/28/2007 GBONILL1 ZONING REVIEW Needs Review
06/28/2007 GBONILL1 ENGINEERING REVIEW Needs Review
06/28/2007 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
06/28/2007 GBONILL1 FIRE REVIEW Needs Review