Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T07CM01666
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/05/2007 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | ELECTRICAL PLAN REVIEW RAY MAJUTA, ELECT PLAN CHECK,9/06/07 THE FOLWWING ITEMS REMAIN A PROBLEM. 1. CIRCUIT 5 FEEDS BOTH BATH ROOM RECEPTACLES AND KITCHEN COUNTER RECEPTACLES. 2. CIRCUIT 9 FEEDS LIGHTING SHOWN ON FIXTURE SCHEDULE AS HAVING A 277 VOLT SUPPLY, THE POWER SYSTEM ON SITE IS 120/240 VOLT SYSTEM. 3. CIRCUIT 6 FOR THE MICROWAVE IS NOT SHOWN ON PLAN. 4. THERE NO LIGHTING TYPE FIXTURES SHOWN FOR LANDSCAPE ON FIXTURE SCHEDULE. 5.FIXTURE SCHEDULE DOES NOT LIST FOUR FOOT TYPE FLUORESCENT TYPE USED ON PLAN, FIXTURE C IS NOT SHOWN ON PLAN AND IS LISTED AS A 277 VOLT TYPE. 6. FIXTURE D TYPE NOT SHOWN ON PLAN. |
09/13/2007 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Mountain Coffee Roasters T07CM01666 Building Plan (3rd Review) TRANSMITTAL DATE: September 13, 2007 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. C:\planning\grading\t07cm01666.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
09/24/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide additional information required to evaluate the support of the fan coil unit from the TJI roof system (e.g. the size of the 1-1/2" long screws, the maximum weight of the fan coil, and the load capacity of the lower plate of the TJI beams) Reference Section 302.1, IMC 2003. 2. Provide lighting and an electrical receptacle for maintenance of the fan coil unit in accordance with Section 306.3.1, IMC 2003. 3. Clarify the termination of the secondary condensate drain. Note 1/M-1 seems to imply that the secondary drain will terminate into the tailpiece of a lavatory. Section 307.2.3 requires that a secondary drain (or a drain from an auxiliary drain pan) shall "discharge to a conspicuous point of disposal". Reference Section 307.2, IMC 2003 and Section 807.2, UPC 2003. 4. Revise the note on sheet M-1 that asks the contractor to "consider" a drain pan and trap to be specific with regard to the code requirements for auxiliary and secondary condensate disposal. Reference Section 307.2.3 IMC 2003. |
09/24/2007 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Comment not addressed. Show the location of the reduced pressure backflow assembly on the drawings, specify the reduced pressure backflow assembly being installed, and indicate the size of the assembly. Reference COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
09/24/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Comment not addressed. Provide the listing for the two-way cleanout fitting called out on the plumbing plan, sheet P-1. Reference Sections 103.2.3 and 707.6, UPC 2003. (Note that a 2-way cleanout is not required per Section 707.4 unless an upper terminal cleanout is not installed.) |
09/27/2007 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | There appears to be a conflict with the structural and mechanical pages. These drawings are ready to be approved for the 500 lb air conditioner load on the roof, but pp M1 shows a FCU suspended from some TJI's |
10/02/2007 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. TUCSON MOUNTAIN COFFEE ROASTERS 2. CONNECTION TO EXISTING ON SITE PRIVATE SEWER 3. NEEDS WASTEWATER 8TH FLOOR CREDIT EVALUATION - 740-6500 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/24/2007 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
10/24/2007 | DELMA ROBEY | REJECT SHELF | Completed |