Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM01666
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/02/2007 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/03/2007 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | ELECTRICAL NOTES, 1. FRONT PAGE STATES,COMPLY WITH 19999 NEC, ELECTRICAL PAGE STSTES GROUNDING SYSTEM TO COMPLY WITH 1996 NEC, BOTH INCORRECT. 2. ELECTRICAL SERVICE DIAGRAM INDICATES EXISTING HOWEVER PLAN SHOWS TWO INTERIOR PANELS TO BE REMOVED, WILL ALL NEW WIRING GO TO SERVICE PANEL SHOWN AS EXISTING? INFORMATION ON ONE LINE DIAGRAM APPEARS TO INDICATE A NEW RUN FROM TEP AND A NEW GROUNDING SYSTEM, IF SO THIS INDICATES A NEW SERVICE, IS THIS TRUE? 3. LOAD CALCULATIONS ARE DONE IN A METHOD USED FOR DWELLING UNITS NOT COMMERCIAL. 4. PROVIDE A LIGHTING FIXTURE SCHEDULE. 5. PROVIDE A LIGHTING LOAD CALCUTION MEETING CURRENT ENERGY LOAD AMOUNTS ALLOWED. |
05/14/2007 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Mountain Coffee Roasters T07CM01666 Building Plan (1st Review) TRANSMITTAL DATE: May 14, 2007 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. C:\planning\grading\t07cm01666.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
05/15/2007 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 05-16-2007 ACTIVITY NUMBER: T07CM01666 PROJECT NAME: MOUNTAIN COFFEE ROASTERS PROJECT ADDRESS: 501 W. GRANT RD. ARCHITECT / ENGINEER: M. TALAVERA PROJECT REVIEWER: LEERAY HANLY TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 520-909-5154 OR EMAIL AT LEERAY.HANLY@TUCSONAZ.GOV IF YOU CARE TO DISCUSS. 1) 1BC 106; PLEASE PROVIDE COMPLETE CODE ANALYSIS FOR THIS PROJECT. a) PLEASE PROVIDE INFORMATION ON WHAT THE PURPOSE OF THIS BUILDING IS; THERE IS CONFLICTING INFORMATION ON COVER SHEET AND FLOOR PLAN AS TO USE b) PLUMBING FIXTURE COUNT REFERENCES DO NOT COINCIDE WITH CHAPTER 29 OF THE IBC. 2) IBC 106.2, 106.1.3; PLEASE DIMENSION SETBACKS TO PROPERTY LINES. JUSTIFY CONSTRUCTION PER TABLES 602 AND 704.8 OF IBC. 3) IBC 106.1.1; a) PLEASE USE 1/8" MINIMUM FONT SIZE FOR DETAIL PAGES. b) PLEASE USE CUT SHEETS TO CROSS REFERENCE DETAILS TO FLOOR PLAN. c) PLEASE REMOVE REFERENCES TO THE INTERNATIONL RESIDENTIAL CODE. THIS IS A CHANGE OF USE AND MUST COMPLY WITH THE INTERNATIONAL BUILDING CODES. 4) IBC 106.1; a) PLEASE DISCLOSE HOW "EXISTING FOOTINGS" WERE EVALUATED. b) PLEASE PROVIDE COMPLETE STRUCTURAL ANALYSIS PER THE IBC FOR ENTIRE BUILDING INDICATING REACTIONS FROM PORCH ADDITION. c) PLEASE CLARIFY TRUSS REPAIR AND PROVIDE STRUCTUAL CALCULATIONS JUSTIFYING REPAIR. d) PLEASE PROVIDE WEIGHT OF NEW MECHANICAL EQUIPMENT (FCU-1) AND JUSTIFY STRUCTURAL SUPPORT IN EXISTING ROOF ASSEMBLY. 5) IBC CHAPTER 11; a) PLEASE INDICATE ACCESSIBLE ROUTE FROM STREET TO BUILDING ENTRANCE. b) PROVIDE DETAILS FOR ACCESSIBLE RESTROOMS INCLUDING SIGNAGE, GRAB BARS, LAVATORY HEIGHTS, ETC. c) ALL COMMON AREAS ARE REQUIRED TO BE ACCESSIBLE, PLEASE DETAIL HOW KITCHENETTE/BREAKROOM AND PREPARATION ROOMS MEET ACCESSIBILITY REQUIREMENTS. 6) IBC 1210; GYPSUM BOARD WITH PAINT DOES NOT MEET SURROUNDING MATERIAL REQUIREMENTS FOR WATERCLOSETS. |
05/17/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The 2003 International Mechanical Code with Local Amendments is the relevant code for this project. 2. Demonstrate energy code compliance using calculations based on the relevant code. Reference Section 101.4, International Energy Conservation Code 2003. 3. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference Section 803.2.8, IECC 2003. 4. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference Section 803.2.1, IECC 2003. 5. Provide the installed weight of the fan coil unit. Reference Section 106.3.1, IMC 2003. 6. Show how the fan coil unit is to be supported from the structure. Reference Section 302.1, IMC 2003. 7. Provide maintenance access and lighting for the fan coil unit in accordance with Sections 306.1 and 306.3, IMC 2003. 8. Show the size, routing, and termination of the condensate drains. Reference Section 307.2, IMC 2003 and Section 807.2, UPC 2003. 9. Provide auxiliary drain pans or secondary drain systems for fan coil units. Reference Section 307.2.3 IMC 2003. 10. Provide calculations demonstrating adequate ventilation. Reference Section 401.2, IMC 2003. 11. Provide information on the sequence of operation for the restroom exhaust to show that recirculation of the air from the restroom will not occur. Reference Section 403.2.1, IMC 2003. 12. Provide information to show how the ductwork has been sized. Reference Section 603.2, IMC 2003. |
05/17/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 2003 Uniform Plumbing Code with Local Amendments. 2. Keynote 7.2 (sheets A-2, A-3, and A-4) calls out a new gas-fired water heater for this project and sheet E-1 shows no power for an electric water heater but an electric water heater is specified on sheet P-1. Please coordinate the project. 3. If the project includes natural gas appliances, provide a natural gas piping design, including the piping layout on a floor plan and a natural gas schematic showing the sizes, loads and developed lengths of the piping. Reference Section 103.2.3, UPC 2003. 4. Provide waste and vent isometrics and water supply isometrics. Reference Section 103.2.3, UPC 2003. 5. Provide the minimum plumbing facilities required by Table 2902.1, IBC 2003, for business occupancy (e.g. a drinking fountain). 6. Provide material standards for all plumbing fixtures being provided by others. Reference Section 401.1, UPC 2003. 7. The maximum flow rates for plumbing fixtures shall be consistent with ARS Title 45, Chapter 1, Article 12. See text at: (http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp). Reference Section 402.1, UPC 2003, as amended by the State of Arizona. 8. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, and valves. Reference Sections 103.2.3, 605.5, and 608.3 UPC 2003. 9. Show size, route and termination of T&P relief piping. Reference Section 608.5, UPC 2003. 10. If the specified water heater is not supplied with integral heat traps, provide 0.5" of insulation with a maximum conductivity of 0.27 btu per inch/h °F on the first 8 feet of supply and discharge piping. Reference Section 804.5, IECC 2003. 11. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003. 12. Provide water pressure and water pipe sizing calculations and include the pressure drop due to the reduced pressure backflow preventer. Reference Section 610.1, UPC 2003. 13. Include all fixtures when calculating the total demand and determining pipe sizes. Reference Section 610.1, UPC 2003. 14. Calculate the water demand using the fixture units shown in Tables 6-4 or A-2. Reference Section 610.3, UPC 2003. 15. Provide the listing for the two-way cleanout fitting called out on the plumbing plan, sheet P-1. Reference Sections 103.2.3 and 707.6, UPC 2003. 16. Provide a schedule of waste fixture units for all plumbing fixtures using the values shown in table 7-3, UPC 2003. Reference Section 703.1, UPC 2003. |
05/17/2007 | ROBERT SHERRY | WATER | REVIEW | Denied | Show the location of the reduced pressure backflow assembly on the drawings, specify the reduced pressure backflow assembly being installed, and indicate the size of the assembly. Reference COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
05/30/2007 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. TUCSON MOUNTAIN COFFEE ROASTERS 2. CONNECTION TO EXISTING ON SITE PRIVATE SEWER 3. NEEDSW COT PLUMBING DRAWING APPROVED PRIOR TO WASTEWATER SEWER CONNECTION FEE REVIEW - (AFTER WHICH NEEDS WASTEWATER 8TH FLOOR CREDIT EVALUATION - 740-6500) |
06/02/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/07/2007 | DELMA ROBEY | APPROVAL SHELF | Completed |
06/07/2007 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
06/07/2007 | GERARDO BONILLA | REJECT SHELF | Completed |