Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T07CM01380
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/15/2007 | DAVE MANN | FIRE | REVIEW | Denied | Sprinklers are required by IFC 903.2.10 Please add the following automatic sprinkler criteria to the plans: 1. The hazard classification of the occupancy including any special hazards. 2. The design standard to be used. 3. The availability and adequacy of the water supply. 4. The design density and the area of operation. |
08/16/2007 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; Central District; Retail Use 6,485 Square Feet; $9,976.98 |
08/19/2007 | GERRY KOZIOL | WWM | REVIEW | Denied | 1:TUCSON MALL CHEVRON OIL STOP:D06-0041 DOES NOT INCLUDE CAR WASH 2:CONNECTING TO ON-SITE PRIVATE SEWER #PT07S03060 3:NEEDS WW/IWC TOM TOMCHAK REVIEW OF OIL/SAND SEPARATOR 579-5771 |
08/21/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/27/2007 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | An approved site plan is required prior to building plan approval. |
08/27/2007 | DAVID RIVERA | ZONING | REVIEW | Denied | 08/27/07 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. Zoning has reviewed the building plans but cannot approve them at this time until the plans have been completely approved through the commercial review process. 2. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval. 3. Zoning will re-review and approve the building plans on the next submittal providing the stamped and approved site plans are included with the building plan package and the building structural portions of the plan review have been approved. See comment 2 for additional info regarding the site plan process. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/26/2007 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
09/26/2007 | DELMA ROBEY | REJECT SHELF | Completed |