Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM01375
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/17/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Coordinate thw water isometric with the plumbing fixture schedule and detail 7/P-1 for pipe sizes and connections to hot water. 2. Provide calculations to show that the specified attachment of the water heater platform is adequate. Clarify to which wall the platform is being attached; the new partition is built with steel studs. 3. Section 414.1, UPC 2003 does not allow the use of the water heater thermostat to limit the water temperature to the public lavatories. 4. Specify the valves to be used for the showers. 5. Note 12 is still in conflict with the plans. 6. Coordinate the size of the cleanouts with the size of the waste pipes. |
| 04/19/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 04/19/2007 | DROBEY1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
| 04/19/2007 | DROBEY1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
| 04/19/2007 | DROBEY1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/19/2007 | DELMA ROBEY | OUT TO CUSTOMER | Completed |