Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM01157
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/22/2007 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 03/22/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Show how recirculation of the HVAC supply air entering the restrooms is prevented from being recirculated. Reference section 403.2.1 (3), IMC 2003. |
| 03/22/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | The specified double check valve is not allowed for use with a carbonator; a reduced pressure backflow preventer is required. Reference Table 6-2, UPC 2003. |
| 03/22/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 03/22/2007 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Needs Review | 1) STRUCTURAL CALCULATIONS ARE REQUIRED FOR NEW FACADE ADDITIONS ADDED TO EXTERIOR BLDG. ARCH ON TOP NEW WIND LOADS. TRELLIS AND AWNINGS. |
| 03/22/2007 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 03/22/2007 | DAVE MANN | FIRE | REVIEW | Approved | |
| 03/22/2007 | ANY | ENGINEERING | REVIEW | Approved | |
| 03/27/2007 | CAGUILA1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 03/27/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |