Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T07CM01074
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/04/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; West District; 4,400 Square Feet @ Retail; $17,544.40 |
| 02/04/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 02/04/2008 | DAVE MANN | FIRE | REVIEW | Denied | The types of construction shown on this plan conflict with the canopy drawings. A separate permit is required for the fuel systems. Please include the following design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. |
| 02/05/2008 | GERRY KOZIOL | WWM | REVIEW | Denied | 1: circle K - issued with grease interceptor 2: needs wastewater 5th floor credit evaluation if applicable 3: needs wastewater 5th floor review of location/method of connection to public sewer (manhole construction permit) need waste review of private sewer extensions for future parcels, easements, jt use agreements, etc. |
| 02/19/2008 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Circle "K" 6th & I10 T07CM01074 Building Plan (2nd Review) TRANSMITTAL DATE: February 25, 2008 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. C:\planning\grading\t07cm01074.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
| 02/21/2008 | JASON GREEN | ENGINEERING | REVIEW | Denied | Building can not be approved prior to Tentative Plat and Site Plan approval. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/16/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |