Review Date Reviewer's Name Type of Review Description Status Comments
03/16/2007 DAVE MANN FIRE REVIEW Approved
03/22/2007 TERRY STEVENS ZONING HC SITE REVIEW Approved
03/22/2007 TERRY STEVENS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: T07CM01033
1702 S Euclid
Cell Tower Site

TRANSMITTAL: 03/22/07

COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. Per LUC Sec. 3.2.5.2.H and .I The 8'-8" wall surrounding the equipment must meet the perimeter yard setbacks. Per LUC Sec. 3.2.6.5.A the required street perimeter yard setback within an established area is 20' or 11/2 times the height of the structure, whichever is greater. The required setback from the street property line for this proposed wall is therefore 20'. The plans indicate a setback of 16'-3". Revise plans to meet this requirement or a Design Development Option (DDO) variance can be applied for.

2. Provide a copy of the last stamped and approved site plan for the entire site. This is required in order to verify existing paving, parking spaces, building size, etc.

If you have any questions about this transmittal, please call Terry Stevens, (520) 791-5550 ext. 2000.

TLS C:\zoning review\cellsite\DSC\T07CM01033.doc
03/28/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
04/02/2007 SREEVES1 ADA REVIEW Passed NOT A COT JOB
04/03/2007 ANDREW CONNOR LANDSCAPE REVIEW Approved
04/03/2007 ANDREW CONNOR NPPO REVIEW Approved
04/20/2007 JASON GREEN ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/08/2007 SUE REEVES REJECT SHELF Completed
05/02/2007 SHANAE POWELL OUT TO CUSTOMER Completed