Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T07CM00998
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/27/2007 | BUREAU VERITAS | 2ND PARTY REVIEW | REVIEW | Approved | |
07/03/2007 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Comment not addressed. Provide a site plan showing the location of the water meter and the backflow assembly. 2. A 2" water meter is appropriate for a maximum demand of 80 GPM or less. Revise the design appropriately. |
07/12/2007 | GERRY KOZIOL | WWM | REVIEW | Approved | |
07/18/2007 | EGRANT1 | ZONING | REVIEW | Denied | 07/18/07 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. 3. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the building plan can be approved by Zoning. Two copies of the approved development plan, landscape and NPPO plans are to be submitted with the building plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the building plans packet processed together for site approval 4. Attach the approved site/development plans and the landscape/NPPO plans to the building plans. |
07/27/2007 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | Approved site plan must be provided for building plan approval. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/06/2007 | SUE REEVES | OUT TO CUSTOMER | Completed |
08/06/2007 | SUE REEVES | REJECT SHELF | Completed |