Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T07CM00824
Parcel: 12510009H

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T07CM00824
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/15/2007 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Approved
03/15/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide justification for not disposing of the sink waste by gravity. Reference Section 709.0, UPC 2003.
Reference Section 302.3, Uniform Administrative Code, 1997.
2. Lift stations for public use require duplex pumps along with visual and audible alarms. Reference Section 710.9, UPC 2003.
3. The 2" sanitary line for the existing service sink is too small to accomodate the discharge from the lift station (2 fixture units per 1 gpm of discharge). Reference Section 710.5, UPC 2003.
4. Provide cleanouts for the pumped discharge of the lift station. Reference Sections 707.4 and 710.7, UPC 2003.
03/15/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide manufacturer's equipment data along with electrical operating information for the baseboard heaters. Reference Section 301.6, IMC 2003.
2. Clarify the design and sequence of operation for the HVAC modifications; which RTU is each diffuser/return air grille to be connected to, where is the controlling thermostat, what damper is being actuated, and how will the revised air flow affect the existing air distribution system?
3. Provide calculations showing that adequate outside air is being provided to the new rooms. Reference Sections 403.3 and 403.3.2, IMC 2003.
03/16/2007 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T07CM00824 3/16/07

1. Provide electrical requirements for sump pump on plumbing plans.
2. Provide electrical requirements for baseboard heater on mechanical plans.
3. Account for receptacle load on panel schedule for Ckt C-22. Reference Electrical Lighting Plan Sheet AE-1.
5. Provide a disconnecting means for the baseboard heater. Reference NEC 424.19.
6. Provide electrical circuit for sump pump.
7. Fill in loads for Panels A, C, and D on MDP panel schedule.
03/29/2007 FSANCHE1 WWM REVIEW Needs Review
03/29/2007 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
03/29/2007 FSANCHE1 OUT TO CUSTOMER Completed