Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T07CM00682
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/21/2007 | TERRY STEVENS | ZONING | REVIEW | Approved | |
02/21/2007 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
02/21/2007 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/27/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
02/27/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003. 2. Provide the listing for the two-way cleanout fitting called out in detail 2/P1.1. Reference Sections 103.2.3 and 707.6, UPC 2003. 3. Specify the materials to be used for the drainage piping and fittings. Reference Section 701.0, UPC 2003. 4. Provide upper terminal cleanouts on horizontal drainage pipe over 5 feet in length. Reference Section 707.4, UPC 2003. 5. Specify lavatory faucets that are designed to ARS Title 45, Chapter 1, Article 12. The maximum flow rate for lavatory faucets shall be no more than an average of one-half gallon of water per minute at a pressure of eighty PSI or they shall be equipped with a mechanism that causes the faucet to close automatically after delivering no more than one-fourth gallon of water. Reference Section 402.1, UPC 2003, as amended by the State of Arizona. 6. Provide fixture descriptions for all plumbing fixtures. Reference Section 401.1, UPC 2003. |
02/27/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
02/27/2007 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Approved | |
02/27/2007 | FSANCHE1 | WWM | REVIEW | Needs Review | |
02/27/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
02/27/2007 | FSANCHE1 | ENGINEERING | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/27/2007 | FSANCHE1 | OUT TO CUSTOMER | Completed |